Lake County, IL
File #: 10-0697    Version: 1 Name: Arlington Heights Road Southbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase I: IDOT Agreement
Type: resolution Status: Passed
File created: 7/21/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 8/10/2010
Title: Joint resolution authorizing the execution of an agreement for the use of Federal Highway Funds between the State of Illinois and Lake County for Phase I preliminary engineering services for the replacement of the deck beams of the bridge carrying southbound Arlington Heights Road over Buffalo Creek and designated as Section 10-00193-07-BR.
Attachments: 1. Arlington Heights Road Southbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase I: IDOT Agreement, 2. 10-0697_20101008144209
Title
Joint resolution authorizing the execution of an agreement for the use of Federal Highway Funds between the State of Illinois and Lake County for Phase I preliminary engineering services for the replacement of the deck beams of the bridge carrying southbound Arlington Heights Road over Buffalo Creek and designated as Section 10-00193-07-BR.
Staff Summary
· Arlington Heights Road Southbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase I: IDOT Agreement.
· The County has been allocated federal HBP funds to repair this bridge and IDOT administers all federal funds.
· Phase I (Preliminary Engineering) is required on all federally funded improvements.
· This agreement provides for the county to receive 80% reimbursement for the cost of Phase I.

Body
R E S O L U T I O N

WHEREAS, Arlington Heights Road (County Highway 79) is a designated route on the county highway system; and

WHEREAS, the bridge deck beams of the bridge carrying southbound Arlington Heights Road over Buffalo Creek are at the end of their useful service life; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if said bridge deck beams could be replaced; and

WHEREAS, Phase I studies are required to utilize federal highway funds for the above-proposed improvements; and

WHEREAS, the State of Illinois and Lake County are desirous of entering into an agreement to utilize federal highway funds for the above-proposed Phase I engineering services (Preliminary Engineering) setting forth the terms and obligations to each agency, a draft of copy of which is attached hereto.

NOW, THEREFORE BE IT RESOLVED that the Chair of the Lake County Board, the County Clerk and the County Engineer of Lake County are authorized and they are hereby directed to execute an agreement and any subsequent amendments hereto, pertaining to the financing of the above-named improvement. The County Engineer shall transmit i...

Click here for full text