File #: 10-0266    Version: 1 Name: U.S. Route 45; IL Route 132 to IL Route 173 Millburn Bypass, Phase I: LCDOT Change Order No. 1
Type: committee action item Status: Passed
File created: 3/17/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 4/2/2010
Title: Joint committee action item approving Change Order No. 1 consisting of an increase of $312,256.06 for additions to the U.S. Route 45; IL Route 132 to IL Route 173 portion of the Millburn Community Preservation Bypass Improvement Phase I Engineering Services, designated as Section No. 05-00262-02-RP.
Attachments: 1. U.S. Rte. 45; IL Rte. 132 to IL Rte. 173, Millburn Bypass, Phase I: LCDOT Change Order No 1
Related files: 09-1632

Title

Joint committee action item approving Change Order No. 1 consisting of an increase of $312,256.06 for additions to the U.S. Route 45; IL Route 132 to IL Route 173 portion of the Millburn Community Preservation Bypass Improvement Phase I Engineering Services, designated as Section No. 05-00262-02-RP.

 

Staff Summary

                     U.S. Route 45; IL Route 132 to IL Route 173 Millburn Bypass, Phase I: LCDOT Change Order No. 1

                     Change Orders need to be approved by the standing committees for cumulative net increases over 10%.

                     The U.S. Route 45 - Millburn Community Preservation Bypass Improvement (Phase I Study) is under contract with Christopher B. Burke Engineering, Ltd., in the amount of $1,780,405.

                     Additional engineering services are being required by IDOT and FHWA to have the Environmental Assessment portion of the Phase I study cover all of U.S. Route 45 from IL Route 132 to IL Route 173 to ensure logical project termini are addressed. 

                     IDOT will be starting a Phase I study for the said length of US Rte. 45 in the future and will reimburse Lake County for this change order No. 1 cost at a later date (see attached letter).

                     This is in addition to the original scope of work as detailed in the attached Supplemental Agreement No. 1. Summary: Original awarded contract: $1,780,405.00; Change Order No. 1: $312,256.06; Sum of all changes: $312,256.06.

 