File #: 12-0536    Version: 1 Name: RR Underpass Washington Street Thoroughfare Improvement; Right-of-Way Acquisition: Appropriation with Condemnation Authority
Type: resolution Status: Passed
File created: 4/26/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 5/8/2012
Title: Joint resolution appropriating $2,500,000 of 2011A Tax Exempt GO Bonds Road Construction funds for the acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the RR Underpass Washington Street Thoroughfare, Washington Street from Haryan Way to Lake Street, and a grade separation of the Canadian National Railroad, designated as Section 11-00121-11-BR.
Title
Joint resolution appropriating $2,500,000 of 2011A Tax Exempt GO Bonds Road Construction funds for the acquisition of necessary right-of-way, by agreement or condemnation, and other right-of-way costs associated with the RR Underpass Washington Street Thoroughfare, Washington Street from Haryan Way to Lake Street, and a grade separation of the Canadian National Railroad, designated as Section 11-00121-11-BR.

Staff Summary
· Railroad Underpass, Washington Street Thoroughfare Improvement; Right-of-Way Acquisition: Appropriation with Condemnation Authority.
· The improvement of Washington Street to widen and provide for a grade separation of the Canadian National Railroad is a chosen project for the transportation challenge bonds 2011 issuance.
· Preliminary plans and specifications for this improvement have been prepared.
· Before right-of-way acquisitions can proceed, an appropriation and condemnation authority is necessary.
· The appropriation is $2,500,000 2011A Tax Exempt GO Bonds Road Construction funds.

Body
R E S O L U T I O N

WHEREAS, Washington Street, County Highway 45, from Hainesville Road, County Highway 24, to Lake Street is a designated route on the County highway system; and

WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Washington Street, between Haryan Way and Lake Street, including a grade separation of the Canadian National Railway, could be improved to provide increased traffic capacities (RR Underpass Washington Street Thoroughfare Improvement); and

WHEREAS, Lake County, by and through its Division of Transportation, has caused to be prepared preliminary plans and right-of-way plats, said plats identifying right-of-way needs; and

WHEREAS, the right-of-way and associated costs are estimated to be $2,500,000.

NOW, THEREFORE BE IT RESOLVED by this Lake County Board:

SECTION 1: It is hereby determined that it is necessary and desirable that Lake County acquire title to and possession of a...