Lake County, IL
File #: 14-0167    Version: 1 Name: 2014 Stormwater Detention Basin Retrofits: Appropriation
Type: resolution Status: Passed
File created: 2/17/2014 In control: Public Works and Transportation Committee
On agenda: Final action: 3/11/2014
Title: Joint resolution appropriating $240,000 of County Bridge Tax funds for the modifications of older existing stormwater detention basins to improve functionality and water quality, and designated as Section 13-00999-44-DR.
Title
Joint resolution appropriating $240,000 of County Bridge Tax funds for the modifications of older existing stormwater detention basins to improve functionality and water quality, and designated as Section 13-00999-44-DR.
 
Staff Summary
·      2014 Stormwater Detention Basin Retrofits: Appropriation.
·      Lake County Division of Transportation proposes to retrofit certain stormwater detention basins with improved design features and best management practices to improve stormwater management and water quality treatment.
·      Before a project letting can be held, an appropriation of $240,000 of County Bridge Tax funds is necessary.
 
Body
WHEREAS, Lake County Division of Transportation proposes to retrofit certain stormwater detention basins with improved design features and best management practices to improve stormwater management and water quality treatment; and
 
WHEREAS, before a construction letting can be held, an appropriation of funds is necessary.
 
NOW, THEREFORE, BE IT RESOLVED, by this Lake County Board, that there is hereby appropriated $240,000 of County Bridge Tax funds for the modifications of older existing stormwater detention basins to improve functionality and water quality, and designated as Section 13-00999-44-DR.
 
DATED at Waukegan, Illinois, on March 11, 2014.