File #: 12-0242    Version: 1 Name: Cedar Lake Road Realignment Feasibility Study; Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 2/23/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 3/13/2012
Title: Joint resolution authorizing the execution of an agreement for consulting engineering services with Crawford, Murphy and Tilly, Inc., Aurora, Illinois, for the completion of a feasibility study for the possible realignment of Cedar Lake Road in the downtown Round Lake area, for a maximum cost of $348,148.16 and appropriating $385,000 of Motor Fuel Tax funds designated as Section 02-00065-01-FP.
Attachments: 1. 12-0242 Cedar Lake Road Realignment Feasibility Study Consultant Agreement.pdf
Title
Joint resolution authorizing the execution of an agreement for consulting engineering services with Crawford, Murphy and Tilly, Inc., Aurora, Illinois, for the completion of a feasibility study for the possible realignment of Cedar Lake Road in the downtown Round Lake area, for a maximum cost of $348,148.16 and appropriating $385,000 of Motor Fuel Tax funds designated as Section 02-00065-01-FP.
Staff Summary
· Cedar Lake Road Realignment Feasibility Study; Consultant Agreement and Appropriation.
· Cedar Lake Road needs to be improved as part of the Village of Round Lake’s downtown development plan, and consulting engineering services will be utilized to complete a feasibility study.
· The selected and recommended consultant is Crawford, Murphy and Tilly, Inc., Aurora, Illinois, at a maximum cost of $348,148.16.
· The resolution also appropriates $385,000 of Motor Fuel Tax funds for this study.

Body
R E S O L U T I O N

WHEREAS, Cedar Lake Road (County Highway 28) is a designated route on the County highway system; and

WHEREAS, the Village of Round Lake is pursuing a long range downtown development plan, which needs to incorporate a more direct connection of Cedar Lake Road from Nippersink Road to Hart Road; and

WHEREAS, it would be beneficial for the safety and welfare of the motoring public if a more direct connection of Cedar Lake Road from Nippersink Road to Hart Road; could be determined and incorporated in said Village downtown plan and County transportation plans; and

WHEREAS, it is advisable that a consultant engineering firm be employed to complete a feasibility study of a more direct connection of Cedar Lake Road from Nippersink Road to Hart Road; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

WHEREAS, Crawford, Murphy and Tilly, Inc., Aurora, Illino...