Lake County, IL
File #: 13-0818    Version: 1 Name: Adaptive Traffic Signal Control: Contract Award
Type: resolution Status: Passed
File created: 7/23/2013 In control: Public Works and Transportation Committee
On agenda: Final action: 8/13/2013
Title: Joint resolution authorizing a contract with Rhythm Engineering, Lenexa, Kansas, in the amount of $246,900 for the purchase of Adaptive Traffic Signal Control equipment for the planned traffic signal modernization along Aptakisic Road, from Brandywyn Lane to Parkway Drive, and designated as Section 11-00088-19-TL.
Title
Joint resolution authorizing a contract with Rhythm Engineering, Lenexa, Kansas, in the amount of $246,900 for the purchase of Adaptive Traffic Signal Control equipment for the planned traffic signal modernization along Aptakisic Road, from Brandywyn Lane to Parkway Drive, and designated as Section 11-00088-19-TL.

Staff Summary
· Adaptive Traffic Signal Control: Contract Award.
· Adaptive Traffic Signal Control is new technology for Lake County that allows for real time collection of traffic data and adjustment of signal timing.
· Aptakisic Road, from Brandywyn Lane to Parkway Drive, has been selected as the first installation.
· A Request for Proposal (RFP) was issued for the purchase of Adaptive Traffic Signal Control along Aptakisic Road, from Brandywyn Lane to Parkway Drive, to 19 vendors and proposals were received from three firms.
· A selection committee comprised of staff from the Division of Transportation, the Illinois Department of Transportation (IDOT), and the Purchasing Division recommend the services of Rhythm Engineering, Lenexa, Kansas, as the firm who best meets the needs of the County based on the RFP evaluation criteria.
· The contract includes purchase of the hardware, training, first and second year maintenance, and warranty at a contract amount of $246,900.
· Maintenance costs for years 3-5 will be $6,000 annually.
· Federal funds from IDOT will pay 80% of the cost.
· The installation of the equipment will be awarded via the County’s bid process and presented for approval at a later meeting.

Body
R E S O L U T I O N

WHEREAS, in accordance with Section 5-102 of the Lake County Purchasing Ordinance, proposals were called for, by publication, for the installation of Adaptive Traffic Signal Control; and

WHEREAS, the Lake County Division of Transportation developed a Systems Engineering Document meeting the Federal Highway Administration’s approval to develop requirements for the Adaptive Traffic Signal Control system; and

WHERE...

Click here for full text