Title
Joint resolution authorizing an Intergovernmental Agreement (IGA) with the Village of Barrington for intersection improvements of Hart Road at United States (US) Route 14.
Staff Summary
* Hart Road at US Route 14 will be improved by widening and reconstruction.
* The improvement will provide additional lanes at the intersection, include multi-use path and sidewalk facilities, add new traffic signals, and add new railroad signals and gates.
* The Village of Barrington owns a watermain and sanitary sewer within the project limits requiring relocation and/or adjustments.
* The Village of Barrington desires construction of a sidewalk and multi-use path, and improvements along Hart Road north of US Route 14, which is under Village jurisdiction.
* The Village of Barrington will reimburse Lake County for the engineering and construction costs associated with this work, estimated to be $281,033.
* This resolution authorizes the execution of an IGA with the Village of Barrington.
* This improvement is included in the Highway Improvement Program, with construction planned to begin in late 2019 or early 2020, and designated as Section 09-00174-05-CH.
Body
R E S O L U T I O N
WHEREAS, Hart Road, County Highway 53, is a designated route on the County highway system; and
WHEREAS, to ensure the free flow of traffic and the safety and welfare of the traveling public, Lake County and the Village of Barrington are desirous of improving Hart Road at US Route 14, by widening and reconstruction, inclusive of non-motorized improvements, and designated as Section 09-00174-05-CH; and
WHEREAS, the Village of Barrington owns a watermain and sanitary sewer within the project limits requiring modifications; and
WHEREAS, the Village of Barrington desires that the County include, as part of the improvement, the construction of a sidewalk and multi-use path, and improvements to North Hart Road which is under the Village's jurisdiction; and
WHEREAS, Lake County and the Village...