Skip to main content
Lake County, IL
File #: 16-0293    Version: 1 Name: 2016 Stormwater Detention Basin Retrofits: Appropriation
Type: resolution Status: Passed
File created: 3/30/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 4/12/2016
Title: Joint resolution appropriating $280,000 of County Bridge Tax funds for the modifications of existing stormwater detention basins to improve functionality and water quality, and designated as Section 15-00999-10-DR.

Title

Joint resolution appropriating $280,000 of County Bridge Tax funds for the modifications of existing stormwater detention basins to improve functionality and water quality, and designated as Section 15-00999-10-DR.

 

Staff Summary

                     2016 Stormwater Detention Basin Retrofits: Appropriation.

                     The Lake County Division of Transportation proposes to retrofit certain stormwater detention basins with improved design features and best management practices to improve stormwater management and water quality treatment.

                     Before a project letting can be held, an appropriation of $280,000 of County Bridge Tax funds is necessary.

 

Body

R E S O L U T I O N

 

WHEREAS, the Lake County Division of Transportation proposes to retrofit certain stormwater detention basins with improved design features and best management practices to improve stormwater management and water quality treatment; and

 

WHEREAS, before a construction letting can be held, an appropriation of funds is necessary.

 

NOW, THEREFORE, BE IT RESOLVED, by this Lake County Board, that $280,000 of County Bridge Tax funds is hereby appropriated for the modifications of older existing stormwater detention basins to improve functionality and water quality, and designated as Section 15-00999-10-DR.

 

DATED at Waukegan, Illinois, on April 12, 2016.