Lake County, IL
File #: 08-0378    Version: 1 Name: Arlington Heights Road Northbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase I: IDOT Agreement
Type: resolution Status: Passed
File created: 7/23/2008 In control: Public Works and Transportation Committee
On agenda: Final action: 8/12/2008
Title: Joint resolution authorizing the Chair of the County Board, the County Clerk and the County Engineer to execute an agreement for the use of Federal Highway Funds between the State of Illinois and Lake County for Phase I engineering services (Preliminary Engineering) for the replacement of the deck beams of the bridge carrying northbound Arlington Heights Road (County Highway 79) over Buffalo Creek and designated as Section 05-00193-04-BR.
Attachments: 1. 6.3.4 ARLINGTON IDOT AGM_20080723083941.pdf
Title
Joint resolution authorizing the Chair of the County Board, the County Clerk and the County Engineer to execute an agreement for the use of Federal Highway Funds between the State of Illinois and Lake County for Phase I engineering services (Preliminary Engineering) for the replacement of the deck beams of the bridge carrying northbound Arlington Heights Road (County Highway 79) over Buffalo Creek and designated as Section 05-00193-04-BR.

Staff Summary
§ Arlington Heights Road Northbound over Buffalo Creek, Bridge Deck
Beam Replacements; Phase I: IDOT agreement.
· The county has been allocated federal HBP funds to repair this bridge
and IDOT administers all federal funds.
· Phase I (Preliminary Engineering) is required on all federally funded
improvements.
· This agreement provides for the county to receive 80% reimbursement for the cost of Phase I.

Body

R E S O L U T I O N

WHEREAS, Arlington Heights Road (County Highway 79) is a designated route on the county highway system; and

WHEREAS, the bridge deck beams of the bridge carrying northbound Arlington Heights Road over Buffalo Creek are at the end of their useful service life; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if said bridge deck beams could be replaced; and

WHEREAS, Phase I studies are required to utilize federal highway funds for the above-proposed improvements; and

WHEREAS, the State of Illinois and Lake County are desirous of entering into an agreement to utilize federal highway funds for the above-proposed Phase I engineering services (Preliminary Engineering) setting forth the terms and obligations to each agency, a draft of copy of which is attached hereto.

NOW, THEREFORE BE IT RESOLVED that the Chair of the Lake County Board, the County Clerk and the County Engineer of Lake County are authorized and they are hereby directed to execute an agreement pertaining to the financi...

Click here for full text