File #: 12-1208    Version: 1 Name: Washington Street, Atkinson Road to Lancer Lane, Bike Path Extension; Phase II Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 10/24/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 11/20/2012
Title: Joint resolution authorizing the execution of a contract with Civiltech Engineering Inc., Itasca, Illinois, for professional services for the provision of Phase II design engineering services for the extension of the Washington Street bike path, from Atkinson Road to Lancer Lane, at a maximum cost of services described as $184,215.73, appropriating $225,000 of Motor Fuel Tax funds for this improvement, and designated as Section 09-00135-11-BT.
Attachments: 1. 12-1208 Washington Street, Atkinson Road to Lancer Lane, Bike Path Extension - Phase II Consultant Agreement and Appropriation
Title
Joint resolution authorizing the execution of a contract with Civiltech Engineering Inc., Itasca, Illinois, for professional services for the provision of Phase II design engineering services for the extension of the Washington Street bike path, from Atkinson Road to Lancer Lane, at a maximum cost of services described as $184,215.73, appropriating $225,000 of Motor Fuel Tax funds for this improvement, and designated as Section 09-00135-11-BT.

Staff Summary
· Washington Street, Atkinson Road to Lancer Lane, Bike Path Extension; Phase II Consultant Agreement and Appropriation.
· The existing bike path along Washington Street will be improved by extending it from Atkinson Road to Lancer Lane, with connectivity to the Village of Grayslake bike path system and to the College of Lake County.
· A consultant will be utilized to undertake Phase II design engineering services for this improvement.
· This resolution authorizes the execution of professional services agreement with Civiltech Engineering Inc., Itasca, Illinois, for Phase II design engineering services and appropriates $225,000 of Motor Fuel Tax funds.

Body
R E S O L U T I O N

WHEREAS, Washington Street, County Highway 45, is a designated route on the County highway system; and

WHEREAS, the free flow of traffic along Washington Street is beneficial to the safety and welfare of the State of Illinois and the County as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial for the safety and welfare of the motoring public if the existing bike path along Washington Street could be improved by extending it from Atkinson Road to Lancer Lane, with connectivity to the Village of Grayslake bike path system and to the College of Lake County; and

WHEREAS, it is advisable that a firm be employed to provide professional services for said bike path extension; and

WHEREAS, Lake County by and through its Division of Transportation has selected a professional engineering ser...

Click here for full text