Title: Joint resolution authorizing an agreement with Regina Webster and Associates, Inc., Chicago, Illinois, for Phase II design engineering services for traffic signal interconnects to Lake County PASSAGE, along various routes in Lake County, at a maximum cost of $59,294.80, appropriating $75,000 of ¼% Sales Tax for Transportation and Public Safety funds, and designated as Section 13-00268-12-TL.
Attachments: 1. 12-1444 2013 PASSAGE Field Elements Design, Consultant Agreement
Title
Joint resolution authorizing an agreement with Regina Webster and Associates, Inc., Chicago, Illinois, for Phase II design engineering services for traffic signal interconnects to Lake County PASSAGE, along various routes in Lake County, at a maximum cost of $59,294.80, appropriating $75,000 of ¼% Sales Tax for Transportation and Public Safety funds, and designated as Section 13-00268-12-TL.

Staff Summary
· 2013 PASSAGE Field Elements Design: Consultant Agreement and Appropriation.
· The Phase II design engineering services are to add approximately 20 traffic signals and Pan Tilt Zoom cameras to the PASSAGE network, plus additional fiber optic cable and wireless links will be designed to expand the network.
· Lake County has a satisfactory working relationship with Regina Webster and Associates, Inc., Chicago, Illinois, under the Local Government Professional Services Selection Act.
· This resolution authorizes the execution of a professional services agreement with Regina Webster and Associates, Inc., Chicago, Illinois, for design engineering services at a maximum cost of $59,294.80 and appropriates $75,000 of ¼% Sales Tax for Transportation and Public Safety funds for that purpose.

Body
R E S O L U T I O N

WHEREAS, Lake County, by and through its PASSAGE Program, endeavors to interconnect traffic control signals systems situated throughout Lake County; and

WHEREAS, Lake County, by and through its Division of Transportation, plan to interconnect approximately 20 traffic signals, along various Lake County routes, to Lake County PASSAGE; and

WHEREAS, it is advisable that a professional engineering services firm be employed to provide Phase II design engineering services; and

WHEREAS, Lake County has selected a professional engineering services firm, Regina Webster and Associates, Inc., Chicago, Illinois, in accordance with the Local Government Professional Services Selection Act, for said signal system enhancements including interconnection wit...