Lake County, IL
File #: 10-0421    Version: 1 Name: Washington Street (Cedar Lake Road to Hainesville Road); Phase II: IDOT Agreement.
Type: resolution Status: Passed
File created: 4/28/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 5/11/2010
Title: Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for Phase II design engineering services for the proposed improvements along Washington Street from Cedar Lake Road to Hainesville Road and designated as Section 05-00121-07-WR.
Attachments: 1. Washington Street (Cedar Lake Road to Hainesville Road); Phase II: IDOT Agreement
Title
Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for Phase II design engineering services for the proposed improvements along Washington Street from Cedar Lake Road to Hainesville Road and designated as Section 05-00121-07-WR.

Staff Summary
· Washington Street (Cedar Lake Road to Hainesville Road); Phase II: IDOT Agreement.
· The County proposes to use federal funds for this improvement and IDOT administers all federal highway funds.
· The proposed improvement consists of a reconstructed 3-lane roadway improvement with curb and gutter, on-road bike lanes in part and a separated bike lane in part and sidewalks.
· Phase I preliminary engineering is nearing completion and Phase II design engineering is required on all federally funded improvements.
· This agreement provides for the county to receive 80% reimbursement of the cost of Phase II.

Body
R E S O L U T I O N

WHEREAS, Washington Street (County Highway 45) is a designated route on the county highway system; and

WHEREAS, the free flow of traffic, along Washington Street from Cedar Lake Road to Hainesville Road, is beneficial to the safety and welfare of the State of Illinois and the county as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial for the safety and welfare of the motoring public if Washington Street from Cedar Lake Road to Hainesville Road could be improved by the construction of a three lane cross section and bike and pedestrian improvements; and

WHEREAS, Phase II engineering services (Design Engineering) are required to utilize federal highway funds for the above-proposed improvements; and

WHEREAS, the State of Illinois and Lake County are desirous of entering into an agreement to utilize federal highway funds for the above-proposed Phase II engineering services (Design Engineering) setting forth the terms and obligations to each agency, a draft...