Title
Joint resolution authorizing an agreement with DLZ Illinois, Chicago, Illinois, for Phase II design engineering services for traffic signal interconnects to Lake County PASSAGE, along various routes in Lake County, at a maximum cost of $45,169.87, appropriating $55,000 of ¼% Sales Tax for Transportation and Public Safety funds, and designated as Section 14-00268-13-TL.
Staff Summary
· 2014 PASSAGE Field Elements Design: Consultant Agreement and Appropriation.
· The Phase II design engineering services will include adding approximately 16 traffic signals and Pan Tilt Zoom cameras to the PASSAGE network, and adding fiber optic cable and wireless links to expand the network.
· Lake County has a satisfactory working relationship with DLZ Illinois (formerly Regina Webster Associates), Chicago, Illinois, under the Local Government Professional Services Selection Act.
· This resolution authorizes the execution of a professional services agreement with DLZ Illinois, Chicago, Illinois, for design engineering services at a maximum cost of $45,169.87 and appropriates $55,000 of ¼% Sales Tax for Transportation and Public Safety funds for that purpose.
Body
R E S O L U T I O N
WHEREAS, Lake County, by and through its PASSAGE Program, endeavors to interconnect traffic control signal systems situated throughout Lake County; and
WHEREAS, Lake County, by and through its Division of Transportation, plans to interconnect approximately 16 traffic signals, along various Lake County routes, to Lake County PASSAGE; and
WHEREAS, it is advisable that a professional engineering services firm be employed to provide Phase II design engineering services; and
WHEREAS, Lake County has selected a professional engineering services firm, DLZ Illinois, Chicago, Illinois, in accordance with the Local Government Professional Services Selection Act, for said signal system enhancements including interconnection with PASSAGE.
NOW, THEREFORE BE IT RESOLVED by this Lake County Boa...