Title
Joint Resolution authorizing the Chair of the County Board, the County Clerk and the County Engineer to execute an agreement for consulting engineering services between Lake County and Hampton, Lenzini, and Renwick Inc., Elgin, Illinois, for the provision of Phase II engineering services (Design Engineering) for the proposed resurfacing of Kelsey Road (County Highway 30) from Illinois Route 22 to US Route 14, and also the resurfacing of River Road (County Highway 4) from Roberts Road (County Highway 35) to Kelsey Road (County Highway 4) at a maximum cost of services described of $94,711.29. This resolution also appropriates $115,000.00 of Motor Fuel Tax funds for this engineering services designated as Section 08-00134-04-RS.
Staff Summary
· Kelsey Road (IL Rt. 22 to US Rt. 14), River Road (Roberts Road to Kelsey Road) Resurfacings, Phase II Engineering Services: Consultant Agreement
· A consultant will be utilized to undertake Phase II engineering services (Design Engineering) for these resurfacings.
· The selected and recommended firm is Hampton, Lenzini, and Renwick Inc., Elgin, Illinois.
· This resolution appropriates $115,000.00 of Motor Fuel Tax funds for these engineering services.
Body
WHEREAS, Kelsey Road (County Highway 30) and River Road (County Highway 4) are designated routes on the county highway system; and
WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Kelsey Road from Illinois Route 22 to US Route 14 could be resurfaced, and also if River Road from Roberts Road to Kelsey Road could be resurfaced; and
WHEREAS, it is advisable that a consultant engineering firm be employed to provide Phase II engineering services (Design Engineering); and
WHEREAS, Lake County by and through its Division of Transportation has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and
WHEREAS, Hampton, Lenzini, a...
Click here for full text