Lake County, IL
File #: 10-0834    Version: 1 Name: Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: Consultant Agreement
Type: resolution Status: Passed
File created: 8/31/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 9/14/2010
Title: Joint resolution authorizing the execution of a supplemental agreement between Lake County and HDR Engineering, Inc., Chicago, Illinois, for the provision of additional Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road at a supplemental cost of services described of $16,148.01 and designated as Section 04-00136-06-CH.
Attachments: 1. Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: Consultant Agreement
Title
Joint resolution authorizing the execution of a supplemental agreement between Lake County and HDR Engineering, Inc., Chicago, Illinois, for the provision of additional Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road at a supplemental cost of services described of $16,148.01 and designated as Section 04-00136-06-CH.

Staff Summary
· Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: Consultant Agreement
· The selected firm of HDR Engineering, Inc., Chicago, Illinois, is proceeding with the Phase II engineering services.
· Additional engineering is necessitated by the Illinois Department of Transportation (IDOT) and the Federal Highway Association (FHWA).
· This resolution authorizes the execution of a supplemental agreement with HDR Engineering, Inc., Chicago, Illinois at a cost of $16,148.01.

Body
R E S O L U T I O N

WHEREAS, Riverwoods Road (County Highway 58) and Everett Road (County Highway 52) are designated routes on the county highway system; and

WHEREAS, it would be beneficial for the safety and welfare of the motoring public if the intersection of Riverwoods Road at Everett Road could be improved by reconstruction and reconfiguration for a roundabout; and

WHEREAS, Phase II (Design Engineering) studies are required for the proposed roundabout at the intersection of Riverwoods Road and Everett Road; and

WHEREAS, this County Board of Lake County, Illinois at its meeting of November 18, 2008 authorized the execution of a Phase II (Design Engineering) agreement with HDR Engineering, Inc., Chicago, Illinois for said Phase II engineering services and appropriated $180,000 of Motor Fuel Tax funds for these engineering services; and

WHEREAS, it has been determined that additional engineering services are being requested by IDOT, for several revisions to the original scope of work as depicted in Change Order No. 2 attached hereto; and

WHEREAS, IDOT, as administrator of th...

Click here for full text