Lake County, IL
File #: 08-0941    Version: 1 Name: Washington Street PASSAGE Interconnect (Sheridan Rd to Teske Blvd); Transit Signal Priority System: PACE Agreement
Type: resolution Status: Passed
File created: 11/6/2008 In control: Public Works and Transportation Committee
On agenda: Final action: 11/18/2008
Title: Joint Resolution authorizing the execution of an agreement between Lake County and PACE for the inclusion of a transit signal priority system in the county’s traffic signal interconnection project along Washington Street in the City of Waukegan and designated as Section 04-00272-00-TL.
Attachments: 1. wash _20081106130649.pdf
Title
Joint Resolution authorizing the execution of an agreement between Lake County and PACE for the inclusion of a transit signal priority system in the county’s traffic signal interconnection project along Washington Street in the City of Waukegan and designated as Section 04-00272-00-TL.

Staff Summary
· Washington Street PASSAGE Interconnect (Sheridan Rd to Teske Blvd); Transit Signal Priority System: PACE Agreement
· Lake County is installing an interconnected traffic control signal system along Washington St in the City of Waukegan between Sheridan Rd and Teske Blvd as part of Lake County PASSAGE.
· Lake County has secured federal CMAQ funds for this improvement, including the installation of a transit signal priority system (TSP).
· PACE desires to utilize the TSP system to facilitate the delivery of their bus services in the Washington St corridor
· The TSP system allows the PACE bus operator to electronically hold or extend the green time on Washington St.

Body
R E S O L U T I O N

WHEREAS, Lake County by and through its Division of Transportation has secured federal CMAQ funds for improvements to the traffic control signals along Washington Street from Sheridan Road in the City of Waukegan to Teske Boulevard in the City of Park City; and

WHEREAS, the above-said traffic control signals are being improved and integrated into a traffic signal system as part of Lake County PASSAGE and designated as Section 04-00272-00-TL; and

WHEREAS, one of the uses of the federal CMAQ funds is to provide a Transit Signal Priority (TSP) system which will allow PACE bus operators to hold and extend green times along said traffic signal system to facilitate the deliver of bus service in the Washington Street corridor; and

WHEREAS, Lake County and PACE are desirous of entering into and agreement for the implementation of said TSP system, a draft copy of which is attached hereto.

NOW, THEREFORE BE IT RESOLVED, by this County Board of Lake County, that the ...

Click here for full text