Title
Joint resolution authorizing an agreement between Lake County and Patrick Engineering, Inc., Lisle, Illinois, for the provision of Phase II design engineering services along Washington Street from Haryan Way to Lake Street and crossing the CN RR for the proposed RR Underpass Washington Street Thoroughfare Improvement and appropriates $2,220,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services designated as Section 11-00121-11-BR.
Staff Summary
· RR Underpass Washington Street Thoroughfare Improvement; Phase II: Consultant Agreement and Appropriation
· The improvement of Washington Street to widen and provide for a grade separation under the Canadian National Railway is a chosen project for the transportation challenge bonds 2011 issuance; however, pay as you go financing will also be used.
· A consultant will be utilized to undertake Phase II design engineering services.
· The selected and recommended firm is Patrick Engineering, Inc., Lisle, Illinois, for a maximum cost of services described is $2,020,454.31.
· This resolution appropriates $2,220,000 of ¼% Sales Tax for Transportation and Public Safety funds.
Body
R E S O L U T I O N
WHEREAS, Washington Street (County Highway 45) from Hainesville Road (County Highway 24) to Lake Street is a designated route on the county highway system; and
WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Washington Street between Haryan Way and Lake Street; including at its crossing with the Canadian National Railroad could be improved to provide increased traffic capacities (RR Underpass Washington Street Thoroughfare Improvement); and
WHEREAS, it is advisable that a consultant engineering firm be employed to provide said Phase II engineering services (Design Engineering); and
WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Governm...
Click here for full text