Lake County, IL
File #: 10-0835    Version: 1 Name: Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
Type: resolution Status: Passed
File created: 8/31/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 9/14/2010
Title: Joint resolution authorizing the execution of a supplement to the agreement between the Illinois Department of Transportation and Lake County for the Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road and designated as Section 04-00136-06-CH.
Attachments: 1. Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
Title
Joint resolution authorizing the execution of a supplement to the agreement between the Illinois Department of Transportation and Lake County for the Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road and designated as Section 04-00136-06-CH.

Staff Summary
· Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
· The County has been allocated federal funds to improve this intersection and IDOT administers all federal highway funds.
· Additional engineering services are being requested by IDOT for several revisions to the original scope of work.
· This resolution authorizes the execution of a supplemental agreement with IDOT to provide for the County to receive 80% reimbursement for the costs of Phase II engineering services.

Body
R E S O L U T I O N

WHEREAS, Riverwoods Road (County Highway 58) and Everett Road (County Highway 52) are designated routes on the county highway system; and

WHEREAS, the free flow of traffic at the intersection of Riverwoods Road and Everett Road is beneficial to the safety and welfare of the State of Illinois and the county as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if the intersection of Riverwoods Road and Everett Road could be improved by reconstruction and reconfiguration for a roundabout; and

WHEREAS, Phase II studies are required to utilize federal highway funds for the above-proposed improvement; and

WHEREAS, this County Board of Lake County, Illinois at its meeting of November 18, 2008 authorized the execution of an agreement between the Illinois Department of Transportation (IDOT) and Lake County for the Phase II engineering services (Design Engineering); and

WHEREAS, it has been determined by IDOT that additional engineering services are being requested, for several revisions to the original scope of work as depicted in Change ...

Click here for full text