Title
Approval of the Stormwater Infrastructure Repair Fund (SIRF) Intergovernmental Agreement with the Village of Mundelein for the Wellington Avenue Drainage Improvements Project in the amount of $65,000.
Staff Summary
• The proposed project includes the design, permitting, and construction of an approximately 0.35 acre-foot naturalized detention basin, 250 linear feet of 12-inch storm sewer, and three storm sewer structures at Property Index Number (PIN) 1024416020.
• The proposed project will prevent structural flooding at 31 Wellington Avenue and 102 Wellington Avenue up to the 10-year critical duration storm event.
• The proposed project will reduce roadway flooding at Wellington Avenue.
• Stormwater Management Commission Approved Eligibility Authorization on December 4, 2025.
• The estimate project cost is $133,000.
• Staff recommends funding the requested amount of $65,000.