File #: 12-0084    Version: 1 Name: Wadsworth Road at Green Bay Road Intersection Improvement: Supplemental Consultant Phase II Agreement and Supplemental Appropriation
Type: resolution Status: Passed
File created: 1/25/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 2/14/2012
Title: Joint resolution authorizing a supplemental appropriation of $85,000 and execution of a supplemental agreement with Christopher B. Burke Engineering, Inc., Rosemont, Illinois, for the provision of additional Phase II professional engineering services for Wadsworth Road at Green Bay Road and designated as Section 03-00033-12-CH.
Attachments: 1. 12-0084 Wadsworth Road at Green Bay Road Phase II Supplemental Consultant Agreement.pdf
Title
Joint resolution authorizing a supplemental appropriation of $85,000 and execution of a supplemental agreement with Christopher B. Burke Engineering, Inc., Rosemont, Illinois, for the provision of additional Phase II professional engineering services for Wadsworth Road at Green Bay Road and designated as Section 03-00033-12-CH.

Staff Summary
· Wadsworth Road at Green Bay Road Intersection Improvement: Supplemental Consultant Phase II Agreement and Supplemental Appropriation.
· Additional Phase II engineering services are necessitated for the redesign of the signals’ interconnect system from wireless to a buried cable system for Wadsworth Road at Green Bay Road.
· This resolution authorizes the execution of a supplemental agreement with Christopher B. Burke Engineering, Inc., Rosemont, Illinois, at a cost of $71,329.93.
· This resolution appropriates $85,000 of Motor Fuel Tax funds for these services.

Body
R E S O L U T I O N

WHEREAS, Wadsworth Road, County Highway 17, is a designated route on the County highway system; and

WHEREAS, it would be beneficial to the safety and welfare of the motoring public if the intersection of Wadsworth Road and Green Bay Road, IL Route 131, could be improved by widening and resurfacing; and

WHEREAS, the Phase II design engineering needs to be completed for the above-proposed improvement; and

WHEREAS, this Lake County Board, at its meeting of February 12, 2008, authorized the execution of a professional engineering agreement with Christopher B. Burke Engineering, Inc., Rosemont, Illinois, for said professional engineering services and appropriated $600,000 of Motor Fuel Tax funds for these engineering services; and

WHEREAS, it has been determined that additional engineering services are required for revisions to the original scope of work for the above-proposed improvement; as depicted in Exhibit A, attached hereto; and

WHEREAS, a supplemental agreement with the consultant is needed, a draft copy of which is a...

Click here for full text