File #: 10-0418    Version: 1 Name: Prairie Crossing Bike Path along Midlothian Road (IL Rte. 176 to Peterson Road; 3 Segments); Phase II: IDOT Agreement
Type: resolution Status: Passed
File created: 4/28/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 5/11/2010
Title: Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for Phase II design engineering services for three missing links in the Prairie Crossing Bike Path along Midlothian Road between IL Rte. 176 and Peterson Road and designated as Section 09-00171-13-BT.
Attachments: 1. Prairie Crossing Bike Path along Midlothian Road (IL Rte. 176 to Peterson Road; 3 Segments); Phase II: IDOT Agreement
Title
Joint resolution authorizing the execution of an agreement for the use of federal highway funds between the State of Illinois and Lake County for Phase II design engineering services for three missing links in the Prairie Crossing Bike Path along Midlothian Road between IL Rte. 176 and Peterson Road and designated as Section 09-00171-13-BT.

Staff Summary
· Prairie Crossing Bike Path along Midlothian Road (IL Rte. 176 to Peterson Road; 3 Segments); Phase II: IDOT Agreement
· The LCDOT has completed the Phase I preliminary engineering studies thru the IDOT approval process with local funds for the construction of the 3 missing links of the Prairie Crossing Bike Path between IL Rte 176 and Peterson Rd.
· The County has been allocated federal CMAQ funds, administered by IDOT for Phase II and the construction of the missing links.
· Phase II design engineering is the next step in advancing this federally funded improvement.
· This agreement provides for the County to receive 80% reimbursement for the costs of Phase II.

Body

R E S O L U T I O N

WHEREAS, Midlothian Road (County Highway 48) is a designated route on the county highway system; and

WHEREAS, the free flow of traffic along Midlothian Road (IL Rte. 176 to Peterson Road) is beneficial to the safety and welfare of the State of Illinois and the county as a whole; and

WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public to construct the 3 missing links of the Prairie Crossing Bike Path along Midlothian Road between IL Rte. 176 and Peterson Road; and

WHEREAS, Phase II engineering services (Design Engineering) are required to utilize federal highway funds for the above-proposed improvement; and

WHEREAS, the State of Illinois and Lake County are desirous of an agreement to utilize federal highway funds for the above proposed Phase II engineering services (Design Engineering) setting forth the terms and obligations to eac...