Title
Joint resolution authorizing the execution of an agreement between Lake County and Ciorba Group, Inc., Chicago, Illinois, for the provision of Phase III engineering (Construction Engineering) for the proposed widening and reconstruction of Washington Street (County Highway 45) from Cemetery Road to West of IL Rte. 21 at a maximum cost for services described of $599,491. This resolution appropriates $690,000 of Matching Tax funds and is designated as Section 02-00110-12-WR.
Staff Summary
· Washington Street (Cemetery Road to west IL Rte. 21) Widening and Reconstruction, Engineering Agreement and Appropriation
· The County has been allocated federal STU/HPS funds for this improvement.
· Phase III engineering (Construction Engineering) is required for this improvement.
· This resolution provides for an agreement with Ciorba Group, Inc., Chicago, IL, for construction engineering services and appropriates $690,000 of Matching Tax funds for these engineering services (to be reimbursed 80% by IDOT).
Body
WHEREAS, Washington Street (County Highway 45) is a designated route on the county highway system; and
WHEREAS, the free flow of traffic along Washington Street is beneficial to the safety and welfare to the State of Illinois and the county as a whole; and
WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if Washington Street from Cemetery Road to West of IL Rte. 21 could be improved by widening and reconstruction; and
WHEREAS, it is advisable that a consulting engineering firm be employed to provide Phase III engineering services (Construction Engineering) for this improvement; and
WHEREAS, Lake County by and through its Division of Transportation has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and
WHEREAS, Ciorba Group, Inc., Chicago, Illinois, are consulting...
Click here for full text