File #: 14-0179    Version: 1 Name: Fremont Center Road Extension Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 2/18/2014 In control: Public Works and Transportation Committee
On agenda: Final action: 3/11/2014
Title: Joint resolution authorizing an agreement with Civiltech Engineering Inc., Itasca, Illinois, for the provision of Phase I preliminary engineering services for the proposed Fremont Center Road extension at a maximum cost of services described as $671,758, appropriating $810,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services, and designated as Section 12-00138-02-ES.
Attachments: 1. 14-0179 Fremont Center Road Phase I Consultant Agreement Draft
Title
Joint resolution authorizing an agreement with Civiltech Engineering Inc., Itasca, Illinois, for the provision of Phase I preliminary engineering services for the proposed Fremont Center Road extension at a maximum cost of services described as $671,758, appropriating $810,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services, and designated as Section 12-00138-02-ES.

Staff Summary
· Fremont Center Road Extension; Phase I Consultant Agreement and Appropriation.
· A consultant will be utilized to complete Phase I preliminary engineering services, which includes investigating corridor alignments for the future extensions of Fremont Center Road, Winchester Road, and Alleghany Road in an area bounded by Illinois Route 60, Peterson Road, and Illinois Route 83.
· The Phase I engineering study will determine the extent of improvements needed near the intersection of Fremont Center Road and Illinois Route 60.
· The selected, and recommended, firm is Civiltech Engineering, Inc., Itasca, Illinois, for a maximum cost of services described as $671,758.
· This resolution appropriates $810,000 of ¼% Sales Tax for Transportation and Public Safety funds.

Body
R E S O L U T I O N

WHEREAS, Fremont Center Road, County Highway 62, is a designated route on the County highway system; and

WHEREAS, the Phase I preliminary engineering services will include investigating corridor alignments for the future extensions of Fremont Center Road, Winchester Road, and Alleghany Road in an area bounded by Illinois Route 60, Peterson Road, and Illinois Route 83; and

WHEREAS, the Phase I engineering study will determine the extent of improvements needed near the intersection of Fremont Center Road and Illinois Route 60; and

WHEREAS, it is advisable that a consultant engineering firm be employed to provide said Phase I preliminary engineering services; and

WHEREAS, Lake County, by and through its Division of Transportation, has selected a pr...