Title
Approval of the Stormwater Infrastructure Repair Fund (SIRF) Eligibility Authorization for the Grant Township Highway Department’s South Shore Long Lake Drainage Improvements Project
Staff Summary
• The project includes grading new swales and installing new storm sewers to improve stormwater conveyance in five residential locations south of Long Lake.
• The proposed project will reduce flooding throughout the community, ensuring safer access for local residents and emergency vehicles, eliminating building flooding and structural damage, and protecting downstream water quality.
• The estimated total project cost is $503,621, including engineering design and construction. The project can be constructed as one project or broken out into phases depending on construction costs.
• Approval of the Eligibility Authorization does not obligate funds. Staff will work with the project applicant to develop a Project Agreement and recommended funding.