Lake County, IL
File #: 11-1149    Version: 1 Name: Delany Road Reconstruction and Widening: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 10/25/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 11/8/2011
Title: Joint resolution authorizing the execution of an agreement for consulting engineering services between Lake County and Ciorba Group, Inc., Chicago, Illinois, for Phase III construction inspection for the roadway reconstruction of Delany Road from York House Road to Wadsworth Road for a maximum cost of $814,113.96 and appropriates $975,000 of ¼ % Sales Tax for Transportation and Public Safety funds and designated as Section 00-00093-18-WR.
Attachments: 1. 11-1149 Delaney Road Reconstruction and Widening, Consultant Agreement and Appropriation.pdf
Title
Joint resolution authorizing the execution of an agreement for consulting engineering services between Lake County and Ciorba Group, Inc., Chicago, Illinois, for Phase III construction inspection for the roadway reconstruction of Delany Road from York House Road to Wadsworth Road for a maximum cost of $814,113.96 and appropriates $975,000 of ¼ % Sales Tax for Transportation and Public Safety funds and designated as Section 00-00093-18-WR.
 
Staff Summary
·      Delany Road Reconstruction and Widening: Consultant Agreement and Appropriation.
·      Delany Road from York House Road to Wadsworth Road needs to be reconstructed and widened, and consulting engineering services will be utilized for the construction inspection.
·      The selected and recommended consultant is Ciorba Group, Inc., Chicago, Illinois, at a maximum cost of services described of $814,113.96.
·      The resolution also appropriates $975,000 of ¼% Sales Tax for Transportation and Public Safety funds for these engineering services.
 
Body
R E S O L U T I O N
 
WHEREAS, Delany Road, County Highway 22, is a designated route on the county highway system; and
 
WHEREAS, it would be beneficial to the safety and welfare of the motoring public if Delany Road could be improved by reconstruction, widening, the installation of permanent traffic control signals and the construction of detention and compensatory flood plain areas; and
 
WHEREAS, it is advisable that a consultant engineering firm be employed to provide construction inspection engineering services for said proposed reconstruction and widening; and
WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and
 
WHEREAS, Ciorba Group, Inc., Chicago, Illinois, are consulting engineers skilled in the provision of said construction inspection engineering services.
 
NOW, THEREFORE BE IT RESOLVED BY this Lake County Board, that Ciorba Group, Inc., Chicago, Illinois, be employed to provide said construction inspection engineering services, and that the County Board Chair, the County Clerk and the County Engineer of Lake County are authorized and they are directed to execute on behalf of Lake County an agreement, a draft copy of said agreement attached hereto, for consultant engineering services between Lake County and Ciorba Group, Inc., Chicago, Illinois, at a maximum cost of $814,113.96.
 
BE IT FURTHER RESOLVED that the County Engineer shall transmit in writing the final agreement, to be executed by the County Board Chair and the County Clerk.
 
BE IT FURTHER RESOLVED that there is hereby appropriated $975,000 of ¼% Sales Tax for Transportation and Public Safety funds for these construction inspection engineering services designated as Section 00-00093-18-WR.
 
BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.
 
DATED at Waukegan, Illinois, on November 8, 2011.