File #: 26-0788    Version: 1 Name: contract with Berger Contractors, Inc., of Wauconda, Illinois, in the amount of $2,333,426.30 for the Base Bid and Alternate #1 Bid for the Rollins Road Force Main Replacement Project.
Type: resolution Status: Joint Committee
File created: 6/12/2026 In control: Public Works and Transportation Committee
On agenda: Final action:
Title: Joint resolution authorizing execution of a contract with Berger Contractors, Inc., of Wauconda, Illinois, in the amount of $2,333,426.30 for the Base Bid and Alternate #1 Bid for the Rollins Road Force Main Replacement Project.
Attachments: 1. 26-0788 Bid Docs Rollins Road FM Replacement, 2. 26-0788 Bid Tab Rollins Road FM Replacement, 3. 26-0788 Vendor Disclosure Rollins Road FM Replacement, 4. 26-0788 Map Rollins Road FM Replacement
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Joint resolution authorizing execution of a contract with Berger Contractors, Inc., of Wauconda, Illinois, in the amount of $2,333,426.30 for the Base Bid and Alternate #1 Bid for the Rollins Road Force Main Replacement Project.

 

Staff Summary

                     The Lake County Department of Public Works owns and operates the Rollins Road Pump Station, which provides sanitary sewer service to residents and businesses in unincorporated Lake County within portions of the Townships of Lake Villa, Avon, and Grant.

                     The pump station conveys wastewater to the Northwest Regional Water Reclamation Facility via a 20-inch force main pipe that has reached the end of its service life.

                     To ensure continued reliable and effective sanitary sewer service, this force main pipe requires replacement with a more durable and adequately sized pipe.

                     The County received bids from four (4) contractors for this work ranging from $2,333,426.30 to $3,514,888 for the combined Base Bid and Alternate #1 Bid for the Rollins Road Force Main Replacement Project.

                     The award of this contract is recommended to the lowest responsive and responsible bidder, Berger Contractors, Inc. of Wauconda, Illinois in the combined Base Bid and Alternate #1 Bid amount of $2,333,426.30.

                     This resolution authorizes and directs the County Purchasing Agent to execute a contract with Berger Contractors, Inc. in the combined Base Bid and Alternate #1 Bid amount of $2,333,426.30.

 

Body

RESOLUTION

 

WHEREAS, the Lake County Department of Public Works owns and operates the Rollins Road Pump Station, which provides sanitary sewer service to residents and businesses in unincorporated Lake County within portions of the Townships of Lake Villa, Avon, and Grant; and

 

WHEREAS, the pump station conveys wastewater to the Northwest Regional Water Reclamation Facility via a 20-inch force main pipe that has reached the end of its service life; and

 

WHEREAS, to ensure continued reliable and effective sanitary sewer service, this force main pipe requires replacement with a more durable and adequately sized pipe; and

 

WHEREAS, in accordance with the Lake County Purchasing Ordinance, bids were called for by publication of the Rollins Road Force Main Replacement Project; and

 

WHEREAS, Berger Contractors, Inc. is the lowest responsive, responsible bidder in the amount of $2,222,426.30 for the Base Bid and $111,000 for Alternate #1 Bid, with a total contract amount of $2,333,426.30; and this project is included in the approved 2026 Public Works Capital Improvement Program.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the Purchasing Agent is hereby authorized and directed to execute a contract with Berger Contractors, Inc., Wauconda, Illinois in the amount of $2,333,426.30 for the Rollins Road Force Main Replacement Project.

 

DATED at Waukegan, Illinois, on July 14, 2026.