Lake County, IL
File #: 11-0071    Version: 1 Name: NEC LS Upgrade Constr Eng Service Agrmt
Type: resolution Status: Consent Agenda
File created: 1/25/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 2/8/2011
Title: Joint resolution authorizing execution of an agreement for professional services with Rezek, Henry, Meisenheimer and Gende, Inc., in the amount of $61,254 for construction engineering services associated with the Northeast Central Pump Station upgrade project.
Attachments: 1. 02.08.11 11-0071 NEC LS Upgrade RHMG Proposal Exhibit.pdf

Title

Joint resolution authorizing execution of an agreement for professional services with Rezek, Henry, Meisenheimer and Gende, Inc., in the amount of $61,254 for construction engineering services associated with the Northeast Central Pump Station upgrade project.

 

Staff Summary

                     The Northeast Central Pump Station is a major wastewater pumping station that provides wastewater transmission services for the Villages of Grayslake, Hainesville, Third Lake and unincorporated portions of Highland Lake.

                     Major equipment has reached the end of its useful life requiring rehabilitation and upgrade and a contract for construction work was awarded to Concord Construction Services in the amount of $1,316,500.

                     Due to the specialized nature of this project the County requires construction related services from an engineering firm qualified for this type of engineering.

                     RHMG has provided prior satisfactory professional services of this type, was the original design consultant for the construction drawings, and is qualified to provide the specialized construction related services.

                     This resolution authorizes the execution of an Agreement for Professional Services with Rezek, Henry, Miesenheimer and Gende, Inc., Libertyville, IL, in the amount of $61,254.00 for construction related services associated with the Northeast Central Pump Station Upgrade Project.

 

Body

R E S O L U T I O N

 

WHEREAS, the County of Lake owns, operates and maintains sanitary sewer systems serving the Northeast Central Lake Facilities Planning Area; and

 

                     WHEREAS, a pump station upgrade is necessary to serve the increasing sewage flows from the upstream service area; and                                           

 

                     WHEREAS, the Public Works Department solicited and received proposals from  professional engineering firms for the design engineering phase of the project and determined that Rezek, Henry, Meisenheimer and Gende, Inc. was the most qualified firm to provide design engineering services; and

 

                     WHEREAS, the County has bid and awarded the contract for the construction phase of the project and is ready to proceed with construction of the Northeast Central Pump Station Upgrade Project; and

 

                     WHEREAS, due to the specialized nature of this project, the County requires construction related services from an engineering firm qualified in this type of engineering; and

 

                     WHEREAS, RHMG is qualified to provide the specialized construction related services for this project; and

 

                     WHEREAS, Lake County has had a prior satisfactory relationship for professional services with RHMG, Inc.; and

 

                     WHEREAS, an Agreement has been negotiated with RHMG, Inc. to provide the necessary engineering services; and

 

                     WHEREAS, execution of an Agreement for Professional Services must be authorized by Resolution of this County Board.

                     NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the Purchasing Agent is hereby authorized and directed to execute the attached Agreement for Professional Services with Rezek, Henry, Meisenheimer and Gende, Inc., Libertyville, IL, in the amount of $61,254.00 for construction engineering services associated with the Northeast Central Pump Station Upgrade Project and charging the costs thereof to Account Number 610-4822620-85010-48310.

DATED at Waukegan, Lake County, Illinois, on this 8th day of February, A.D., 2011.