File #: 25-1072    Version: 1 Name: Center Street at Atkinson Road Intersection Improvements: Phase I Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 8/14/2025 In control: Public Works and Transportation Committee
On agenda: Final action: 9/9/2025
Title: Joint resolution authorizing an agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, to provide professional engineering services for improvements at the intersection of Center Street and Atkinson Road at a maximum cost of $1,526,891 and appropriating $1,835,000 of 1/4% Sales Tax for Transportation funds.
Attachments: 1. 25-1072 Center Street at Atkinson Road Improvements Draft Consultant Agreement, 2. 25-1072 Center Street at Atkinson Road Vendor Disclosure CBBEL, 3. 25-1072 Center Street at Atkinson Road

Title

Joint resolution authorizing an agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, to provide professional engineering services for improvements at the intersection of Center Street and Atkinson Road at a maximum cost of $1,526,891 and appropriating $1,835,000 of ¼% Sales Tax for Transportation funds.

 

Staff Summary

                     A consultant will be utilized to complete a Phase I study of potential improvements to the intersection of Center Street and Atkinson, inclusive of a new multi-use path.

                     Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.

                     The Lake County Division of Transportation’s (LCDOT) Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.

                     LCDOT received and evaluated Statements of Interest and Qualifications from 18 professional firms, of which three were short-listed and presented to a consultant selection committee.

                     This project is included in the Transportation Improvement Program and designated as Section 24-00189-06-CH.

 

Body

RESOLUTION

 

WHEREAS, Center Street, County Highway 77, is a designated route on the county highway system; and

 

WHEREAS, Lake County believes it would be beneficial to the safety and welfare of the traveling public if the intersection of Center Street and Atkinson Road could be improved, inclusive of a new multi-use path; and

 

WHEREAS, Phase I professional engineering services are required for these improvements; and

 

WHEREAS, it is recommended that a consultant engineering firm be employed to provide these Phase I professional engineering services; and

 

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

 

WHEREAS, Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, are consulting engineers skilled in the provision of these Phase I professional engineering services; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that Christopher B. Burke Engineering, Ltd. be employed to provide said professional engineering services for a maximum cost of $1,526,891, and that the County Board Chair, the County Clerk, and the County Engineer of Lake County are authorized, and hereby directed to execute on behalf of Lake County, an agreement, a draft copy of said agreement attached hereto, for consultant engineering services with Christopher B. Burke Engineering, Ltd. and such authorization shall include any necessary subsequent amendments; and

 

BE IT FURTHER RESOLVED, that the County Engineer shall transmit, in writing, the final agreement and any subsequent amendments, to be executed by the County Board Chair and the County Clerk; and

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $1,835,000 of ¼% Sales Tax for Transportation funds for these engineering services, and designated as Section 24-00189-06-CH; and

 

BE IT FURTHER RESOLVED, that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further board action, providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.

 

DATED at Waukegan, Illinois, on September 9, 2025.