File #: 16-0308    Version: 1 Name: Joint resolution ratifying a contract with RHMG Engineers, Inc., Mundelein, Illinois, in the amount not to exceed $58,412 to provide consulting services for the Bridlewood Reservoir Improvements Project.
Type: resolution Status: Passed
File created: 3/30/2016 In control: Public Works and Transportation Committee
On agenda: Final action: 4/12/2016
Title: Joint resolution ratifying a contract with RHMG Engineers, Inc., Mundelein, Illinois, in the amount not to exceed $58,412 to provide consulting services for the Bridlewood Reservoir Improvements Project.

Title

Joint resolution ratifying a contract with RHMG Engineers, Inc., Mundelein, Illinois, in the amount not to exceed $58,412 to provide consulting services for the Bridlewood Reservoir Improvements Project.

 

Staff Summary

                     On February 6, 2015, Public Works authorized a professional services contract in the amount of $44,516 with RHMG Engineers, Inc., Mundelein, Illinois, in accordance with the Local Government Professional Services Selection Act.

                     The scope of work under this contract included design, bidding, and construction services for the reservoir improvements and a second set of bidding documents for the abandonment of well number seven for the Bridlewood Reservoir Improvements Project.

                     A contract modification for additional services is required as a result of direction received during a variance hearing with the Lake County Zoning Board of Appeals for site revisions to CLCJAWA proposed improvements for the Lake Michigan Water Project, and the abandonment of well number six.

                     This resolution ratifies the existing contract with RHMG Engineers, Inc., Mundelein, Illinois, in the amount of $44,516 and approves the contract modification of $13,896 to increase the existing contract to a not to exceed amount of $58,412.

 

Body

R E S O L U T I O N

 

WHEREAS, the County of Lake (County) owns, operates and maintains the Bridlewood Reservoir in Grandwood Park; and

 

WHEREAS, the Bridlewood Reservoir is in need of upgrades in preparation of Lake Michigan water delivery; and

 

WHEREAS, due to the specialized nature of this project, the County requires design services from an engineering firm qualified in this type of engineering; and

 

WHEREAS, as part of the design for the project, Public Works authorized a professional services contract in the amount of $44,516 with RHMG Engineers, Inc., Mundelein, Illinois in accordance with Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and

 

WHEREAS, the scope of work under this contract included design, bidding, and construction services for the reservoir improvements and a second set of bidding documents for the abandonment of well number 7 for the Bridlewood Reservoir Improvements Project; and

 

WHEREAS, a contract modification for additional services is required as a result of direction received during a variance hearing with the Lake County Zoning Board of Appeals for site revisions to CLCJAWA proposed site improvements for the Lake Michigan Water Project, and the abandonment of well number 6; and

 

WHEREAS, this resolution ratifies the existing contract with RHMG Engineers, Inc., Mundelein, Illinois in the amount of $44,516 and approves the contract modification to increase the existing contract to a not to exceed amount of $58,412; and

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Board ratifies a contract with RHMG Engineers, Inc. in a not to exceed amount of $58,412 to provide consulting services for the Bridlewood Reservoir Improvements Project, charged to account number 610-4853506-71170-000-000-000-48310 and 610-4843598-71170-000-000-000-48310.

 

DATED at WAUKEGAN, LAKE COUNTY, ILLINOIS, on this 12th day of April, A.D., 2016.