File #: 09-1518    Version: 1 Name: 2009 Township Motor Fuel Tax; Warren Township Road District: Contract Award
Type: resolution Status: Passed
File created: 4/30/2009 In control: Public Works and Transportation Committee
On agenda: Final action: 5/12/2009
Title: Joint resolution authorizing a contract for hot mix asphalt removal and pavement resurfacing on Twin Oaks Drive, Alexandria Court, Dillon Court and North Wooddale Trail in Warren Township Road District and designated as Section 09-14142-00-GM, to Greg Greenhill Construction Co., Inc., Ringwood, Illinois in the amount of $159,705.08.

Title

Joint resolution authorizing a contract for hot mix asphalt removal and pavement resurfacing on Twin Oaks Drive, Alexandria Court, Dillon Court and North Wooddale Trail in Warren Township Road District and designated as Section 09-14142-00-GM, to Greg Greenhill Construction Co., Inc., Ringwood, Illinois in the amount of $159,705.08.

 

Staff Summary

                     2009 Township Motor Fuel Tax; Warren Township Road District: Contract Award.

                     A total of 5 bids were received and the lowest responsible bidder is Greg Greenhill Construction Co., Inc., Ringwood, Illinois, in the amount of $159,705.08.

 

Body

R E S O L U T I O N

 

                     WHEREAS, pursuant to authority granted by this Board of Lake County, the County Engineer heretofore called for sealed bids, by publication, for hot mix asphalt removal and pavement resurfacing on Twin Oaks Drive, Alexandria Court, Dillon Court and North Wooddale Trail in Warren Township Road District and designated as Section 09-14142-00-GM; and

 

                     WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on April 28, 2009, at 10:00 AM at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Greg Greenhill Construction Co., Inc.

Ringwood, IL

$159,705.08

 

Peter Baker & Son Co., Inc.

Lake Bluff, IL

$161,411.91

 

Payne & Dolan, Inc.

Antioch, IL

$166,764.05

 

Curran Contracting

Lake Bluff, IL

$169,135

 

Meridian Construction Co., Inc.

Lake Bluff, IL

$207,956.40

 

                     WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Greg Greenhill Construction Co., Inc., Ringwood, Illinois their bid being $159,705.08, based on estimated quantities and unit prices; and

 

                     NOW, THEREFORE BE IT RESOLVED by this County Board of Lake County that a contract be awarded to said Greg Greenhill Construction Co., Inc.

Ringwood, Illinois in accordance with their bid of $159,705.08 based on estimated quantities and unit prices and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for hot mix asphalt removal and pavement resurfacing on Twin Oaks Drive, Alexandria Court, Dillon Court and North Wooddale Trail in Warren Township Road District and designated as Section 09-14142-00-GM.

 

                     BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further Board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation.

 

                     BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 22, 2003.

 

 

Dated at Waukegan, Illinois, on this 12th day of May A.D., 2009