File #: 17-0624    Version: 1 Name: Innerface Signage
Type: resolution Status: Passed
File created: 5/30/2017 In control: Financial & Administrative Committee
On agenda: Final action: 6/13/2017
Title: Resolution ratifying a contract with Innerface Architectural Signage, Inc., Atlanta, Georgia, in an amount not to exceed $41,612.60 to provide design, manufacturing and installation of signage for the Depke Phase One Expansion.
Attachments: 1. Exterior Signage Quote 052217, 2. Overflow Signage Quote

Title

Resolution ratifying a contract with Innerface Architectural Signage, Inc., Atlanta, Georgia, in an amount not to exceed $41,612.60 to provide design, manufacturing and installation of signage for the Depke Phase One Expansion.

 

Staff Summary

                     On January 18, 2017, Finance and Administrative Services authorized a purchase order in the amount of $29,912.86 with Innerface Architectural Signage, Inc., Atlanta, Georgia, per their proposal dated December 20, 2016.

                     The scope of work under their proposal included design, manufacturing and installation of signage necessary for the Depke Phase One Expansion.

                     A contract modification for additional services is required as a result of the design process and additional signage that was not foreseeable at the onset of the procurement process. 

                     This resolution ratifies the existing contract with Innerface Architectural Signage, Inc., Atlanta, Georgia, in the amount of $29,912.86 and approves the contract modification of $11,699.74 to increase the existing contract to a not to exceed amount of $41,612.60.

 

Body

R E S O L U T I O N

 

 

WHEREAS, the Depke Phase One Expansion is in need of interior and exterior signage; and

 

WHEREAS, as part of the design for the project, FAS authorized a purchase order in the amount of $29,912.86 with Innerface Architectural Signage, Inc., Atlanta, Georgia, per their proposal dated December 20, 2016; and

 

WHEREAS, the scope of work under their proposal included design, manufacturing and installation of all signage for the Depke Phase One Expansion; and

 

WHEREAS, a contract modification for additional services is required as a result of the design process and additional signage that was not foreseeable at the onset of the procurement process; and

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Board ratifies a contract with Innerface Architectural Signage, Inc. in a not to exceed amount of $41,612.60 to provide additional design, manufacturing and installation services for the Depke Phase One Expansion, charged to account number 101-1103285-82020-000-000-000-F1611.

 

DATED at Waukegan, Illinois, on June 13, 2017.