Lake County, IL
File #: 13-1077    Version: 1 Name: Division of Transportation, Building E Electrical Service Work: Contract Award
Type: resolution Status: Consent Agenda
File created: 9/25/2013 In control: Public Works and Transportation Committee
On agenda: Final action: 10/8/2013
Title: Joint resolution authorizing a contract with Pieper Electric, Kenosha, Wisconsin, in the amount of $40,012 for the replacement of the existing 400 amp, 480 volt grounded “B” electrical service with a 400 amp 277/480 volt electric service at building E located at the Division of Transportation in Libertyville, Illinois.
Attachments: 1. 13-1077 DOT Building E Electrical Service Contract Award BidTab

Title

Joint resolution authorizing a contract with Pieper Electric, Kenosha, Wisconsin, in the amount of $40,012 for the replacement of the existing 400 amp, 480 volt grounded “B” electrical service with a 400 amp 277/480 volt electric service at building E located at the Division of Transportation in Libertyville, Illinois.

 

Staff Summary

                     Division of Transportation, Building E Electrical Service Work: Contract Award.

                     The Division of Transportation needs to replace electric service at building E.

                     This project will be paid from the Division of Transportation’s operating budget.

                     A total of three bids were received, ranging from $40,012 to $69,513, and the lowest responsible bidder is Pieper Electric of Kenosha, Wisconsin, in the amount of $40,012.

 

Body

R E S O L U T I O N

 

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for replacing the 400 amp 480 volt electric service with a 400 amp 277/480 volt electric service at building E located at the Division of Transportation in Libertyville, Illinois; and

 

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on September 19, 2013, at 10:00 AM at the Lake County Permit Facility in Libertyville, Illinois; a tabulation of said bids as follows:

 

Pieper Electric

Kenosha, WI

$40,012

 

Homestead Electric

Ingleside, IL

$43,900

 

Electrical Contractors Inc.

Mundelein, IL

$69,513

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Pieper Electric, Kenosha Wisconsin, their bid being $40,012, based on estimated quantities and unit prices; and

 

WHEREAS, the project will be funded from the Division of Transportation’s 2013 operating budget.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board that a contract be awarded to said Pieper Electric, Kenosha Wisconsin, in accordance with their bid of $40,012 based on estimated quantities and unit prices and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized, and they are hereby directed to enter into a contract with said low bidder for replacing the 400 amp 480 volt electric service with a 400 amp 277/480 volt electric service at building E located at the Division of Transportation in Libertyville, Illinois.

 

DATED at Waukegan, Illinois, on October 8, 2013.