Lake County, IL
File #: 12-0329    Version: 1 Name: 2012 Township Motor Fuel Tax; Warren Township Road District: Contract Award
Type: resolution Status: Passed
File created: 3/21/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 4/10/2012
Title: Joint resolution authorizing a contract for bituminous pavement removal, patching, and pavement resurfacing on Old Woods Trail and Twin Lakes Boulevard in Warren Township Road District, to Peter Baker & Son Company, Lake Bluff, Illinois in the amount of $199,104.97 and designating as Section 12-14143-00-GM.
Attachments: 1. 12-0329 Warren Township Road District Bid Tabulation

Title

Joint resolution authorizing a contract for bituminous pavement removal, patching, and pavement resurfacing on Old Woods Trail and Twin Lakes Boulevard in Warren Township Road District, to Peter Baker & Son Company, Lake Bluff, Illinois in the amount of $199,104.97 and designating as Section 12-14143-00-GM.

 

Staff Summary

                     2012 Township Motor Fuel Tax; Warren Township Road District: Contract Award.

                     A total of three bids were received, ranging from $199,104.97 to $238,694.82, with Peter Baker & Son Company, Lake Bluff, Illinois being the lowest responsible bidder with a contract amount of $199,104.97.

 

Body

R E S O L U T I O N

 

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for bituminous pavement removal, patching, and pavement resurfacing on Old Woods Trail and Twin Lakes Boulevard from North Battershall Road to North Mill Road in Warren Township Road District, and designated as Section 12-14143-00-GM; and

 

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on March 20, 2012, at 10:00 AM at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Peter Baker & Son Company

Lake Bluff, Illinois

$199,104.97

 

Payne & Dolan, Inc.

Kenosha, WI

$232,276.08

 

Curran Contracting Company

Crystal Lake, IL

$238,694.82

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker & Son Company, Lake Bluff, Illinois, their bid being $199,104.97, based on estimated quantities and unit prices; and

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a contract be awarded to said Peter Baker & Son Company, Lake Bluff, Illinois, in accordance with their bid of $199,104.97 based on estimated quantities and unit prices and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for  bituminous pavement removal, patching, and pavement resurfacing on Old Woods Trail and Twin Lakes Boulevard  from North Battershall Road to North Mill Road in Warren Township Road District, and designated as Section 12-14143-00-GM.

 

BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 and Section 6-701.1without further Board action.

 

BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 22, 2003, and subject to the approval of the Warren  Township Road District Highway Commissioner.

 

DATED at Waukegan, Illinois, on April 10, 2012.