File #: 23-1314    Version: 1 Name: Arlington Heights Road (Lake Cook Rd to IL 83): Phase III Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 9/13/2023 In control: Public Works and Transportation Committee
On agenda: Final action: 10/10/2023
Title: Joint resolution authorizing an agreement with Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, for Phase III construction engineering services for improvements to Arlington Heights Road, from Lake Cook Road to Illinois Route 83, at a maximum cost of $2,086,056 and appropriating $2,504,000 of Motor Fuel Tax funds.
Attachments: 1. 23-1314 Consultant Agreement, Arlington Heights Road Reconstruction Draft, 2. 23-1314 Vendor Disclosure, CBBEL, 3. 23-1314 Location Map, Arlington Heights Road

Title

Joint resolution authorizing an agreement with Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, for Phase III construction engineering services for improvements to Arlington Heights Road, from Lake Cook Road to Illinois Route 83, at a maximum cost of $2,086,056 and appropriating $2,504,000 of Motor Fuel Tax funds.

 

Staff Summary

                     Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, will be utilized to perform the Phase III construction engineering services for improvements to Arlington Heights Road, from Lake Cook Road to Illinois Route 83, inclusive of non-motorized improvements.

                     Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.

                     The Lake County Division of Transportation’s Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.

                     The Lake County Division of Transportation received Statements of Interest and Qualifications from 18 qualified, professional engineering firms.

                     This project is included in the Transportation Improvement Program with construction planned to begin in 2024 and designated as Section 17-00193-08-PV.

 

Body

RESOLUTION

 

WHEREAS, Arlington Heights Road, County Highway 79, is a designated route on the County highway system; and

 

WHEREAS, to ensure the free flow of traffic and the safety and welfare of the traveling public, Lake County believes it would be beneficial to make improvements to Arlington Heights Road, from Lake Cook Road to Illinois Route 83, inclusive of non-motorized improvements; and

 

WHEREAS, Phase III construction engineering services are required for these improvements; and

 

WHEREAS, it is advisable that a consultant engineering firm be employed to provide these Phase III construction engineering services; and

 

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

 

WHEREAS, Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, are consulting engineers skilled in the provision of these Phase III construction engineering services; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Board Chair, the County Clerk and the County Engineer of Lake County are authorized, and are hereby directed to execute on behalf of Lake County, an agreement, and any amendments, between Lake County and Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, at a maximum amount of $2,086,056 for Phase III construction engineering services for improvements to Arlington Heights Road, from Lake Cook Road to Illinois Route 83, a draft copy of which is attached hereto; and

 

BE IT FURTHER RESOLVED, that the County Engineer shall transmit, in writing, the final agreement, and any amendments, to be executed by the County Board Chair and the County Clerk; and

 

BE IT FURTHER RESOLVED, that the County Clerk is hereby directed to transmit four certified originals of this resolution to the district office of the Illinois Department of Transportation; and

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $2,504,000 of Motor Fuel Tax funds for these Phase III construction engineering services, and designated as Section 17-00193-08-PV; and

 

BE IT FURTHER RESOLVED, that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation; and

 

BE IT FURTHER RESOLVED, that this appropriation be processed by the County Engineer for final approval on behalf of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated May 3, 2018.

 

DATED at Waukegan, Illinois, on October 10, 2023.