Lake County, IL
File #: 12-0879    Version: 1 Name: Arlington Heights Road Southbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase III: IDOT Agreement and Appropriation
Type: resolution Status: Passed
File created: 8/1/2012 In control: Public Works and Transportation Committee
On agenda: Final action: 8/14/2012
Title: Joint resolution authorizing the execution of an agreement with the State of Illinois/ Illinois Department of Transportation (IDOT) for replacement of the deck beams on the bridge carrying southbound Arlington Heights Road over Buffalo Creek, appropriating $145,000 of County Bridge Tax funds, and designated as Section 10-00193-07-BR.
Attachments: 1. 12-0879 Arlington Heights Road Southbound Bridge Agreement Draft
Title
Joint resolution authorizing the execution of an agreement with the State of Illinois/ Illinois Department of Transportation (IDOT) for replacement of the deck beams on the bridge carrying southbound Arlington Heights Road over Buffalo Creek, appropriating $145,000 of County Bridge Tax funds, and designated as Section 10-00193-07-BR.
 
Staff Summary
·      Arlington Heights Road Southbound over Buffalo Creek, Bridge Deck Beam Replacements; Phase III: IDOT Agreement and Appropriation.
·      The County has been allocated federal funds, administered by IDOT, for construction and Phase III construction engineering.
·      This agreement provides for the County's 20% share, and the 80% federal share of this improvement.
·      Phase III construction engineering to be completed by Lake County Division of Transportation staff.
·      This resolution appropriates $145,000 of Matching Tax funds for the County's share of the construction costs.
 
Body
R E S O L U T I O N
 
WHEREAS, Arlington Heights Road (County Highway 3) is a designated route on the County highway system; and
 
WHEREAS, the free flow of traffic along Arlington Heights Road is beneficial to the safety and welfare of the State of Illinois and the County as a whole; and
 
WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if the deck beams of the bridge carrying southbound Arlington Heights Road over Buffalo Creek are replaced; and
 
WHEREAS, Phase I and Phase II engineering have been completed and the project is ready for a contract letting; and
 
WHEREAS, Phase III construction engineering is required to utilize federal highway funds for the above-described improvement, which engineering will be provided by County engineering staff; and
 
WHEREAS, the State of Illinois and Lake County are desirous of an agreement to utilize federal highway funds for the above proposed construction and Phase III construction engineering services setting forth the terms and obligations to each agency, a draft of which is attached hereto; and
 
WHEREAS, in order to proceed to a construction letting, an appropriation of funds is needed along with approval of this agreement.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that the County Board Chair, the County Clerk and the Acting County Engineer of Lake County are authorized and they are directed to execute an agreement, and any subsequent amendments required by IDOT thereto, pertaining to the financing of the above-named improvement.
 
BE IT FURTHER RESOLVED that the Acting County Engineer shall transmit, in writing, the final agreement, and any amendments, to be executed by the County Board Chair and the County Clerk, and grant plan and specification approval to IDOT.
 
BE IT FURTHER RESOLVED that there is appropriated $145,000 of Matching Tax funds and designated as Section 10-00193-07-BR.
 
BE IT FURTHER RESOLVED that this agreement, and any amendments, when executed in their final form be submitted to IDOT for their approval and final processing.
 
DATED at Waukegan, Illinois, on August 14, 2012