Lake County, IL
File #: 24-1099    Version: 1 Name: Old McHenry Crossings: Phase II Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 8/16/2024 In control: Public Works and Transportation Committee
On agenda: Final action: 9/10/2024
Title: Joint resolution authorizing an agreement with TranSystems Corporation of Schaumburg, Illinois, for Phase II professional engineering services, for improvements to Old McHenry Road, from Fairfield Road to Bonnie Lane, inclusive of a grade separation at the Canadian National railroad, at a maximum cost of $8,011,948 and appropriating $9,614,000 of 1/4% Sales Tax for Transportation funds.
Attachments: 1. 24-1099 Presentation, Old McHenry Crossings Phase II, 2. 24-1099 Consultant Agreement, Old McHenry Crossings Phase II, 3. 24-1099 Vendor Disclosure, TranSystems, 4. 24-1099 Location Map, Old McHenry Crossings Phase II

Title

Joint resolution authorizing an agreement with TranSystems Corporation of Schaumburg, Illinois, for Phase II professional engineering services, for improvements to Old McHenry Road, from Fairfield Road to Bonnie Lane, inclusive of a grade separation at the Canadian National railroad, at a maximum cost of $8,011,948 and appropriating $9,614,000 of ¼% Sales Tax for Transportation funds.

 

Staff Summary

                     TranSystems Corporation of Schaumburg, Illinois, will be utilized to perform the Phase II professional engineering services for improvements to Old McHenry Road, from Fairfield Road to Bonnie Lane, including a grade separation, intersection improvements, and non-motorized improvements.

                     Lake County selects professional engineering firms in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.

                     The Lake County Division of Transportation’s Consultant Selection Process has been approved by the Federal Highway Administration and the Illinois Department of Transportation, and the firm selected for this project was selected in accordance with this approved process.

                     Lake County Division of Transportation received and evaluated Statements of Interest and Qualifications from eight professional firms, of which three were short-listed and presented to a consultant selection committee.

                     This project is included in the Transportation Improvement Program and designated as Section 19-00999-65-ES.

 

Body

RESOLUTION

 

WHEREAS, Old McHenry Road, County Highway 32; Fairfield Road, County Highway 49; and Quentin Road, County Highway 5, are designated routes on the County highway system; and

 

WHEREAS, Lake County believes it would be beneficial for the safety and welfare of the traveling public to improve Old McHenry Road, from Fairfield Road to Bonnie Lane, inclusive of a grade separation, intersection improvements and non-motorized improvements; and

 

WHEREAS, Phase II professional engineering services are required for these improvements; and

 

WHEREAS, it is recommended that a consultant engineering firm be employed to provide Phase II professional engineering services for said proposed improvements; and

 

WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and

 

WHEREAS, TranSystems Corporation of Schaumburg, Illinois, are consultant engineers skilled in the provision of these Phase II professional engineering services; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Board Chair, the County Clerk, and the County Engineer of Lake County are authorized and hereby directed to execute on behalf of Lake County an agreement, and any amendments, between Lake County and TranSystems Corporation of Schaumburg, Illinois, at a maximum amount of $8,011,948, for Phase II professional engineering services for improvements to Old McHenry Road, from Fairfield Road to Bonnie Lane, inclusive of a grade separation, intersection improvements, and non-motorized improvements, a draft copy of which is attached hereto; and

 

BE IT FURTHER RESOLVED, that the County Engineer shall transmit, in writing, the final agreement, and any amendments, to be executed by the County Board Chair and the County Clerk; and

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $9,614,000 of ¼% Sales Tax for Transportation funds for these Phase II professional engineering services, and designated as Section 19-00999-65-ES; and

 

BE IT FURTHER RESOLVED, that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further board action providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.

 

DATED at Waukegan, Illinois, on September 10, 2024.