File #: 11-0302    Version: 1 Name: Delany Road Widening (Sunset Ave. to Wadsworth Rd.) Project Phase II Design Engineering Services: Supplemental Appropriation
Type: resolution Status: Passed
File created: 3/30/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 4/12/2011
Title: Joint resolution appropriating a supplemental amount of $25,000 of Matching Tax funds for additions to the Delany Road Widening Project from Sunset Ave. to Wadsworth Rd., for Phase II Design Engineering Services, and designated as Section No. 00-00093-15-WR.
Title
Joint resolution appropriating a supplemental amount of $25,000 of Matching Tax funds for additions to the Delany Road Widening Project from Sunset Ave. to Wadsworth Rd., for Phase II Design Engineering Services, and designated as Section No. 00-00093-15-WR.
 
Staff Summary
·      Delany Road Widening from Sunset Ave. to Wadsworth Rd. Project Phase II Design Engineering Services: Supplemental Appropriation
·      The County Board has provided $900,000 for Phase II Design Engineering services to date.
·      Additional Phase II Design Engineering services have been requested for revisions to the Plat of Highway and legal descriptions, adding curb/gutter/storm sewer to Wadsworth Road west of Delany Road, deleting the Joseph Drive proposed right turn lane, creating sediment/erosion control plans per stage and additional agency coordination.
·      A supplemental appropriation of $25,000 of Matching Tax funds is necessary to provide for the cost of these additional services and designated as Section 00-00093-15-WR.
 
Body
R E S O L U T I O N
 
WHEREAS, Delany Rd. (County Highway 22) is a designated route on the county highway system; and
 
WHEREAS, it would be beneficial to the safety and welfare of the motoring public if Delany Rd. from Sunset Ave. to Wadsworth Rd. could be improved by widening and reconstruction; and      
 
WHEREAS, Lake County, by and through its Division of Transportation, has caused to be prepared Phase II (Design Engineering) plans; and
 
WHEREAS, this County Board of Lake County, Illinois has appropriated a total of $900,000 for Phase II (Design Engineering) engineering services to date; and
 
WHEREAS, this supplemental appropriation is needed to provide for additional Phase II (Design Engineering) engineering services for revisions to the Plat of Highway and Legal Descriptions, adding curb/gutter/storm sewer to Wadsworth Road west of Delany Road, deleting the Joseph Drive proposed right turn lane, creating sediment/erosion control plans per stage and additional agency coordination and is estimated to be $25,000.
 
NOW, THEREFORE BE IT RESOLVED BY this County Board of Lake County, Illinois, that there is hereby appropriated an additional $25,000 of Matching Tax funds for Phase II (Design Engineering) services for the widening and reconstruction of Delany Road from Sunset Ave. to Wadsworth Rd. and designated as Section 00-00093-15-WR.
 
DATED at Waukegan, Illinois, on April 12, 2011