Title: Joint resolution authorizing a contract for the resurfacing of Fisher Road from the intersection with Darrell Road northeast 5325 feet to the Village of Volo Corporate limits in Wauconda Township Road District and designated as Section 10-15134-00-RS to Peter Baker & Son, Co., Lake Bluff, Illinois in the amount of $157,876.92.
Attachments: 1. 2010 Part II - Township Motor Fuel Tax; Wauconda Township Road District: Contract Award, 2. 10-0800_20101008144131

Title

Joint resolution authorizing a contract for the resurfacing of Fisher Road from the intersection with Darrell Road northeast 5325 feet to the Village of Volo Corporate limits in Wauconda Township Road District and designated as Section 10-15134-00-RS to Peter Baker & Son, Co., Lake Bluff, Illinois in the amount of $157,876.92.

 

Staff Summary

                     2010 Part II - Township Motor Fuel Tax; Wauconda Township Road District: Contract Award.

                     A total of 5-bids were received and the lowest responsible bidder is Peter Baker & Son, Co., Lake Bluff, Illinois in the amount of $157,876.92.

Body

R E S O L U T I O N

 

                     WHEREAS, pursuant to authority granted by this Board of Lake County, the County Engineer heretofore called for sealed bids, by publication, for 2” hot mix asphalt surface removal Class D patching, and constructing hot-mix asphalt leveling binder and hot-mix asphalt surface course lifts on Fisher Road from the intersection with Darrell Road northeast 5325 feet to the Village of Volo Corporate limits in Wauconda Township Road District and designated as Section 10-15134-00-RS; and

 

                     WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on August 24, 2010, at 10:00 AM at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Peter Baker & Son Co.

Lake Bluff, IL

$157,876.92

 

Curran Contracting Company

Crystal Lake, IL

$174,537.15

 

Geske and Sons, Inc.

Crystal Lake, IL

$198,034.15

 

Payne & Dolan, Inc.

Antioch, IL

$198,387.00

 

J.A. Johnson Paving Company

Arlington Heights, IL

$233,000.00

 

                     WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Peter Baker and Son, Co., Lake Bluff, Illinois their bid being $157,876.92 based on estimated quantities and unit prices; and

 

                     NOW, THEREFORE BE IT RESOLVED by this County Board of Lake County that a contract be awarded to Peter Baker and Son, Co., Lake Bluff, Illinois in accordance with their bid of $157,876.92 based on estimated quantities and unit prices and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for 2” hot mix asphalt surface removal Class D patching, and constructing hot-mix asphalt leveling binder and hot-mix asphalt surface course lifts on Fisher Road from the intersection with Darrell Road northeast 5325 feet to the Village of Volo Corporate limits in Wauconda Township Road District and designated as Section 10-15134-00-RS.

 

                     BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further Board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation.

 

                     BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated January 22, 2003.

 