Lake County, IL
File #: 13-0389    Version: 1 Name: Miller Road Improvement: Village of North Barrington Agreement and Appropriation
Type: resolution Status: Passed
File created: 3/28/2013 In control: Public Works and Transportation Committee
On agenda: Final action: 5/14/2013
Title: Joint resolution authorizing an agreement with the Village of North Barrington for compensatory flood storage and temporary easements for the Miller Road improvement, appropriating $150,000 of County Bridge Tax funds, and designated as Section 08-00118-09-BR.
Attachments: 1. 13-0389 Miller Road, Village of North Barrington Agreement
Title
Joint resolution authorizing an agreement with the Village of North Barrington for compensatory flood storage and temporary easements for the Miller Road improvement, appropriating $150,000 of County Bridge Tax funds, and designated as Section 08-00118-09-BR.
 
Staff Summary
·      Miller Road Improvement: Village of North Barrington Agreement and Appropriation.
·      Miller Road, from Glen Circle Drive to Biltmore Drive, will be elevated by the placement of a three span bridge to alleviate road flooding.
·      This improvement will require 2882 cubic yards of off-site compensatory flood storage and four temporary easements owned by the Village of North Barrington.
·      The County will compensate the Village of North Barrington $150,000 for said compensatory flood storage.
·      This resolution authorizes the execution of an agreement with the Village of North Barrington for compensatory flood storage and temporary easements for the Miller Road improvement, and appropriates $150,000 of County Bridge Tax funds.
·      The Village Board of North Barrington approved this agreement on March 19, 2013.
 
Body
R E S O L U T I O N
 
WHEREAS, Miller Road, County Highway 2, is a designated route on the County highway system; and
      
WHEREAS, it would be beneficial for the safety and welfare of the motoring public if Miller Road, from Glen Circle Drive to Biltmore Drive, could be elevated by the placement of a three span bridge to alleviate road flooding; and
 
WHEREAS, the improvement will require 2882 cubic yards of off-site compensatory flood storage and four temporary easements owned by the Village of North Barrington; and
 
WHEREAS, Lake County and the Village of North Barrington are desirous of entering into an agreement providing the terms and conditions for the compensatory flood storage and four temporary easements, a draft copy attached hereto; and  
 
WHEREAS, Lake County will compensate the Village of North Barrington $150,000 for said compensatory flood storage; and
 
WHEREAS, an appropriation of funds is required; and
 
WHEREAS, the Village of North Barrington approved this agreement on March 19, 2013.
 
NOW, THEREFORE BE IT RESOLVED that the County Board Chair, the County Clerk, and the County Engineer of Lake County be authorized, and they are hereby directed to execute an agreement with the Village of North Barrington for the compensatory flood storage and four temporary easements.
 
BE IT FURTHER RESOLVED that the County Engineer shall transmit, in writing, the final agreement to be executed by the County Board Chair and the County Clerk.
 
BE IT FURTHER RESOLVED that $150,000 of County Bridge Tax funds are appropriated for this improvement, and designated as Section 08-00118-09-BR.
 
DATED at Waukegan, Illinois on April 9, 2013.