Skip to main content
Lake County, IL
File #: 17-0616    Version: 1 Name: Well Pump Maintenance & Service
Type: resolution Status: Passed
File created: 5/26/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 6/13/2017
Title: Joint resolution authorizing a contract with Water Well Solutions, Elburn, Illinois, for well pump maintenance and repair services for Lake County Public Works in the estimated annual amount of $59,675, with renewal options.
Attachments: 1. 17107 Award Recommendation, 2. 17107 Bid Tab

Title

Joint resolution authorizing a contract with Water Well Solutions, Elburn, Illinois, for well pump maintenance and repair services for Lake County Public Works in the estimated annual amount of $59,675, with renewal options.

 

Staff Summary

                     Lake County owns and operates five public water systems that utilize well water as their source water supply.  These five well systems contain 43 total wells.

                     The well pumps and associated equipment require preventative maintenance and repair that necessitate the services of a contractor specialized in well repair. 

                     The Contractor shall be responsible for mobilization/demobilization, well sounding, pump extraction, installation, and testing.  The bid price includes all labor, parts, equipment costs, portal-to-portal transportation charges, and all other charges of every kind and nature.   

                     An invitation to bid was issued and extended to 12 vendors and sealed bids were received from two vendors ranging from $59,675 to $92,580.

                     Water Well Solutions, Elburn, Illinois, was determined to be the lowest responsive and responsible bidder who best meets the needs of the County in the estimated annual amount of $59,675 based on a per unit price.

 

Body

RESOLUTION

 

WHEREAS, there is a need to establish a source for the preventive maintenance and repair of well pumps throughout Lake County, Illinois; and

 

WHEREAS, the Contractor shall be responsible for mobilization/demobilization, well sounding, pump extraction, installation and testing.  The bid price includes all labor, parts, equipment costs, all portal-to-portal transportation charges, and all other charges of every kind and nature; and

 

WHEREAS, in accordance with Chapter 33.036 of the Lake County Purchasing Ordinance, a bid was called for by publication for Well Pump Maintenance and Repair Services for Lake County Public Works; and

 

WHEREAS, sealed bids were received from two vendors at the Lake County Administrative Building, Waukegan, Illinois, on May 11, 2017; and

 

WHEREAS, based on the criteria set forth in the bid; the staff evaluated all bids submitted and determined that the bid submitted by Water Well Solutions, Elburn, Illinois, in the estimated annual amount of $59,675 is the lowest responsive and responsible bidder for Lake County.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that the Purchasing Agent is authorized to enter into a contract with Water Well Solutions, Elburn, Illinois, for well pump maintenance and repair services for Lake County Public Works in the estimated annual amount of $59,675 based on a per unit price, charged to various public works accounts.

 

DATED at Waukegan, Illinois, on June 13, 2017.