Lake County, IL
File #: 09-1793    Version: 1 Name: Wilson Road at Nippersink Road, Roundabout improvements: Phase I Consultant Agreement
Type: resolution Status: Passed
File created: 7/28/2009 In control: Public Works and Transportation Committee
On agenda: Final action: 9/8/2009
Title: Joint resolution authorizing the execution of an agreement between Lake County and Transystems Corporation, Schaumburg, Illinois, for the provision of Phase I preliminary engineering services for the round-a-bout improvement to Wilson Road (County Highway 7) at Nippersink Road at a maximum cost of services described of $374,810.02 and appropriates $450,000 of Matching Tax funds for these engineering services designated as Section 03-00070-06-CH.
Attachments: 1. 1793 wilson agrmt_20090827122014.pdf
Title
Joint resolution authorizing the execution of an agreement between Lake County and Transystems Corporation, Schaumburg, Illinois, for the provision of Phase I preliminary engineering services for the round-a-bout improvement to Wilson Road (County Highway 7) at Nippersink Road at a maximum cost of services described of $374,810.02 and appropriates $450,000 of Matching Tax funds for these engineering services designated as Section 03-00070-06-CH.
Staff Summary
·      Wilson Road at Nippersink Road, Roundabout improvements: Phase I Consultant Agreement.
·      A consultant will be utilized to undertake Phase I preliminary engineering services.
·      The selected and recommended firm is Transystems Corporation, Schaumburg, Illinois.
·      This resolution appropriates $450,000 of Matching Tax funds.
Body
 
      WHEREAS, Wilson Road (County Highway 7) is a designated route on the county highway system; and
 
      WHEREAS, it would be beneficial for the safety and welfare of the motoring public if the intersection of Wilson Road at Nippersink Road could be improved by the installation of a roundabout; and
 
      WHEREAS, it is advisable that a consultant engineering firm be employed to provide said Phase I engineering services (Preliminary Engineering); and
 
WHEREAS, Lake County by and through its Division of Transportation has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act (50 ILCS 510/1 et. seq.); and   
 
WHEREAS, Transystems Corporation, Schaumburg, Illinois, are consulting engineers skilled in the provision of said Phase I engineering services (Preliminary Engineering).
 
NOW, THEREFORE BE IT RESOLVED BY this County Board of Lake County, Illinois, that Transystems Corporation, Schaumburg, Illinois, be employed to provide said Phase I engineering services (Preliminary Engineering), and that the Chair of the County Board, the County Clerk and the County Engineer of Lake County are authorized and they are directed to execute, on behalf of Lake County, an agreement for consultant engineering services between Lake County and Transystems Corporation, Schaumburg, Illinois. The County Engineer shall transmit in writing the final agreement to be executed by the Chair of the Lake County Board and the County Clerk.   
 
BE IT FURTHER RESOLVED that there is hereby appropriated $450,000 of Matching Tax funds for these engineering services designated as Section 03-00070-06-CH.
 
BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated herein does not exceed the appropriation aforesaid.
 
Dated at Waukegan, Illinois, on this 11th day of August A.D., 2009