Lake County, IL
File #: 17-0836    Version: 1 Name: Hutchins Road at Mill Creek Culverts: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 7/25/2017 In control: Public Works and Transportation Committee
On agenda: Final action: 8/8/2017
Title: Joint resolution authorizing an agreement with Hampton, Lenzini, and Renwick, Inc., Elgin, Illinois, at a cost of $256,683.98, for Phase I preliminary engineering and Phase II design engineering services to repair or replace three culverts crossing at Hutchins Road at Mill Creek Road, appropriating $310,000 of County Bridge Tax funds, and designated as Section 17-00275-02-BR.
Attachments: 1. 17-0836 Hutchins Road at Mill Creek Culverts Phase I and II Consultant Services Agreement Draft.pdf

Title

Joint resolution authorizing an agreement with Hampton, Lenzini, and Renwick, Inc., Elgin, Illinois, at a cost of $256,683.98, for Phase I preliminary engineering and Phase II design engineering services to repair or replace three culverts crossing at Hutchins Road at Mill Creek Road, appropriating $310,000 of County Bridge Tax funds, and designated as Section 17-00275-02-BR.

 

Staff Summary

                     Hutchins Road at Mill Creek Culverts: Consultant Agreement and Appropriation.

                     Three culverts on Hutchins Road at Mill Creek need repair or replacement.

                     A consulting engineering firm will be utilized to provide Phase I preliminary engineering and Phase II design engineering services for this improvement.

                     In accordance with the Local Government Professional Services Selection Act, the selected and recommended consultant is Hampton, Lenzini, and Renwick, Inc., Elgin, Illinois, at a maximum cost of services of $256,683.98.

 

Body

R E S O L U T I O N

 

WHEREAS, Hutchins Road, County Highway 81, is a designated route on the County Highway System; and

  

WHEREAS, three culverts on Hutchins Road at Mill Creek need repair or replacement; and

 

WHEREAS, it is advisable that a professional engineering services firm be employed to provide Phase I preliminary engineering and Phase II design engineering services; and

 

WHEREAS, Lake County has selected a professional engineering services firm, Hampton, Lenzini, and Renwick, Inc., of Elgin, Illinois, in accordance with the Local Government Professional Services Selection Act, for said engineering services. 

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that Hampton, Lenzini, and Renwick, Inc., of Elgin, Illinois, be employed to provide professional engineering services to repair or replace the three culverts on Hutchins Road at Mill Creek, and that the County Board Chair, the County Clerk and the Acting County Engineer of Lake County are authorized and they are directed to execute, on behalf of Lake County, a contract and any subsequent amendments, a draft of which is attached hereto, for the provision of said professional engineering services between Lake County and Hampton, Lenzini, and Renwick, Inc., of Elgin, Illinois, at a cost of $256,683.98.

 

BE IT FURTHER RESOLVED that the Acting County Engineer shall transmit, in writing, the final agreement, and any subsequent amendments, to be executed by the County Board Chair and the County Clerk.  

 

BE IT FURTHER RESOLVED that there is hereby appropriated $310,000 of County Bridge Tax funds for these engineering services, and designated as Section 17-00275-02-BR.

 

BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action, providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.

 

DATED at Waukegan, Illinois, on August 8, 2017.