Lake County, IL
File #: 10-1128    Version: 1 Name: Four Corners Drainage Basin; Intergovernmental: Agreement
Type: resolution Status: Passed
File created: 11/3/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 11/16/2010
Title: Joint resolution authorizing an intergovernmental agreement among the Stormwater Management Commission (SMC), Avon Township Highway Department, Fremont Township Highway Department and Lake County to fund the Four Corners Drainage Basin design. The resolution also appropriates $10,000 in County Bridge Tax funds.
Attachments: 1. Four Corners Drainage Basin; Intergovernmental: Agreement

Title

Joint resolution authorizing an intergovernmental agreement among the Stormwater Management Commission (SMC), Avon Township Highway Department, Fremont Township Highway Department and Lake County to fund the Four Corners Drainage Basin design.  The resolution also appropriates $10,000 in County Bridge Tax funds.

 

Staff Summary

                     Four Corners Drainage Basin; Intergovernmental: Agreement

                     Wilson Road (County Highway 7) experiences periodic flooding between IL Rte. 120 and IL Rte. 60 due to a failing drain tile located in the area commonly known as the Four Corners Drainage Basin.

                     This resolution authorizes an intergovernmental agreement among the Stormwater Management Commission (SMC), Avon Township Highway Department, Fremont Township Highway Department and Lake County to provide funding for the design, construction plans and bid documents for a new 2,000 foot section of storm sewer to replace the failing drain tile.

                     A future construction letting is contingent on assembling sufficient construction funding from the said parties.

                     This resolution also appropriates $10,000 in County Bridge Funds.

 

Body

R E S O L U T I O N

 

                     WHEREAS, Wilson Road (County Highway 7) experiences periodic flooding between IL Rte. 120 and IL Rte. 60 due to a failing drain tile located in the area; and

 

                     WHEREAS, this section of Wilson Road and the failing drain tile are both located within a 1,000 acre drainage area commonly known as the Four Corners Drainage Basin located in west central Lake County; and

 

                     WHEREAS, the Stormwater Management Commission (SMC), Avon Township Highway Department , Fremont Township Highway Department and Lake County are desirous of entering into an intergovernmental agreement to fund the design and prepare construction plans and bid documents for a new 2,000 foot section of storm sewer; a draft copy of said agreement is attached hereto; and

 

                     WHEREAS, Lake County’s share of this funding shall not exceed $10,000 for the design phase.

 

                     NOW, THEREFORE BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Engineer of Lake County be authorized and is directed to execute an intergovernmental agreement among the Stormwater Management Commission (SMC), Avon Township Highway Department, Fremont Township Highway Department and Lake County to fund the Four Corners Drainage Basin design.

 

                     BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2 of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated herein does not exceed the appropriation aforesaid.

 

DATED at Waukegan, Illinois, on November 16, 2010.