File #: 10-0835    Version: 1 Name: Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
Type: resolution Status: Passed
File created: 8/31/2010 In control: Public Works and Transportation Committee
On agenda: Final action: 9/14/2010
Title: Joint resolution authorizing the execution of a supplement to the agreement between the Illinois Department of Transportation and Lake County for the Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road and designated as Section 04-00136-06-CH.
Attachments: 1. Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
Title
Joint resolution authorizing the execution of a supplement to the agreement between the Illinois Department of Transportation and Lake County for the Phase II design engineering services for the proposed roundabout at Riverwoods Road and Everett Road and designated as Section 04-00136-06-CH.
 
Staff Summary
·      Riverwoods Road at Everett Road, Roundabout; Supplemental Phase II: IDOT Agreement
·      The County has been allocated federal funds to improve this intersection and IDOT administers all federal highway funds.
·      Additional engineering services are being requested by IDOT for several revisions to the original scope of work.
·      This resolution authorizes the execution of a supplemental agreement with IDOT to provide for the County to receive 80% reimbursement for the costs of Phase II engineering services.
 
Body
R E S O L U T I O N
 
WHEREAS, Riverwoods Road (County Highway 58) and Everett Road (County Highway 52) are designated routes on the county highway system; and
 
      WHEREAS, the free flow of traffic at the intersection of Riverwoods Road and Everett Road is beneficial to the safety and welfare of the State of Illinois and the county as a whole; and
 
WHEREAS, the State of Illinois and Lake County believe it would be beneficial to the safety and welfare of the motoring public if the intersection of Riverwoods Road and Everett Road could be improved by reconstruction and reconfiguration for a roundabout; and
 
WHEREAS, Phase II studies are required to utilize federal highway funds for the above-proposed improvement; and
 
WHEREAS, this County Board of Lake County, Illinois at its meeting of November 18, 2008 authorized the execution of an agreement between the Illinois Department of Transportation (IDOT) and Lake County for the Phase II engineering services (Design Engineering); and
 
WHEREAS, it has been determined by IDOT that additional engineering services are being requested, for several revisions to the original scope of work as depicted in Change Order No. 2 attached hereto; and
 
WHEREAS, the State of Illinois and Lake County are desirous of a supplemental agreement to utilize federal highway funds for the above proposed Phase II engineering services setting forth the terms and obligations to each agency, a draft of which is attached hereto.  
 
NOW, THEREFORE BE IT RESOLVED, by this County Board of Lake County, Illinois that the Chair of the County Board, the County Clerk and the County Engineer of Lake County are authorized and they are directed to execute a supplemental agreement and any subsequent amendments, pertaining to the financing of the above-named improvement. The County Engineer shall transmit in writing the final agreement and any amendments, to be executed by the Chair of the Lake County Board and the County Clerk, and grant plan and specification approval to the Illinois Department of Transportation. This improvement is designated as Section 04-00136-06-CH.
 
      BE IT FURTHER RESOLVED that this agreement when executed in its final form be submitted to the Illinois Department of Transportation for their approval and final processing.
 
 
Dated at Waukegan, Illinois, this 14th day of September A.D., 2010