Lake County, IL
File #: 11-0429    Version: 1 Name: O’Plaine Road at Kennedy Drive; Phase I and II: Consultant Agreement and Appropriation
Type: resolution Status: Passed
File created: 4/27/2011 In control: Public Works and Transportation Committee
On agenda: Final action: 5/10/2011
Title: Joint resolution authorizing the execution of an agreement for consulting engineering services between Lake County and McClure Engineering Associates, Waukegan, Illinois, for Phase I and II engineering services for the removal of the intersection of Kennedy Drive at O’Plaine Road and to make an internal roadway improvements in the adjacent subdivision at a maximum cost of $52,157.50 and appropriates $65,000 of Matching Tax funds and designated as Section 09-00109-06-CH.
Attachments: 1. 11-0429 O'Plaine at Kennedy Contract Attachment.pdf
Title
Joint resolution authorizing the execution of an agreement for consulting engineering services between Lake County and McClure Engineering Associates, Waukegan, Illinois, for Phase I and II engineering services for the removal of the intersection of Kennedy Drive at O'Plaine Road and to make an internal roadway improvements in the adjacent subdivision at a maximum cost of $52,157.50 and appropriates $65,000 of Matching Tax funds and designated as Section 09-00109-06-CH.
 
Staff Summary
·      O'Plaine Road at Kennedy Drive; Phase I and II: Consultant Agreement and Appropriation.
·      Phase I and II consulting engineering services to remove the intersection of Kennedy Drive at O'Plaine Road as it is too close to Illinois Route 120.
·      Engineering work includes preparing a new connection to Kennedy Drive via for a new roadway in the subdivision.
·      This work is being coordinated with the City of Waukegan.
·      The selected and recommended consultant is McClure Engineering Associates, Waukegan, Illinois, at a maximum cost of services described of $52,157.50.
·      The resolution also appropriates $65,000 of Matching Tax funds for this improvement.
 
Body
R E S O L U T I O N
 
WHEREAS, O'Plaine Road, County Highway 38, is a designated route on the county highway system; and
 
WHEREAS, Kennedy Drive intersects O'Plaine Road just south of Illinois Route 120; and
 
WHEREAS, it would be beneficial for the safety and welfare of the motoring public if the intersection of Kennedy Drive at O'Plaine Road could be removed in cooperation with the City of Waukegan; and  
 
WHEREAS, the removal of the intersection of Kennedy Drive at O'Plaine Road requires that the public road access to the subdivision currently served by Kennedy Drive be served instead by a new road connection to Kennedy Drive with an extension of West Avenue, in cooperation with the City of Waukegan; and
 
WHEREAS it is advisable that a consultant engineering firm be employed to provide  Phase I and II engineering services for said intersection removal and new subdivision road construction; and
WHEREAS, Lake County, by and through its Division of Transportation, has selected a professional engineering services firm in accordance with the Local Government Professional Services Selection Act, 50 ILCS 510/1 et. seq.; and   
 
WHEREAS, McClure Engineering Associates, Waukegan, Illinois, are consulting engineers skilled in the provision of said Phase I and II engineering services.
 
NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that McClure Engineering Associates, Waukegan, Illinois, be employed to provide said Phase I and II engineering services for the removal of the intersection of Kennedy Drive at O'Plaine Road and making internal roadway improvement in the adjacent subdivision and that the County Board Chair, the County Clerk and the County Engineer of Lake County are authorized and they are directed to execute on behalf of Lake County an agreement, a draft copy of said agreement attached hereto, for consultant engineering services between Lake County and McClure Engineering Associates, Waukegan, Illinois at a maximum cost of $52,157.50.
 
BE IT FURTHER RESOLVED that the County Engineer shall transmit in writing the final agreement, to be executed by the County Board Chair and the County Clerk.   
 
BE IT FURTHER RESOLVED that there is hereby appropriated $65,000 of Matching Tax funds for these Phase I and II engineering services and designated as Section 09-00109-06-CH.
 
BE IT FURTHER RESOLVED that this agreement be administered in accordance with Chapter 605, Act 5, Section 5-205.2, of the Illinois Compiled Statutes without further Board action providing the final contract cost chargeable under the funds appropriated does not exceed the appropriation.
 
DATED at Waukegan, Illinois on May 10, 2011.