Title: Joint resolution appropriating a supplemental amount of $570,000 of Motor Fuel Tax funds and approving Change Order Number Two with Christopher B. Burke Engineering, Ltd. in the amount of $1,026,121 for additions to the Phase II engineering services contract for improvements along Deerfield Road, from Illinois Route 21 to Saunders Road.
Attachments: 1. 24-1515 Change Order Number Two, Deerfield Road Phase II, 2. 24-1515 Vendor Disclosure, Burke, 3. 24-1515 Location Map, Deerfield Road Phase II Supplement

Title

Joint resolution appropriating a supplemental amount of $570,000 of Motor Fuel Tax funds and approving Change Order Number Two with Christopher B. Burke Engineering, Ltd. in the amount of $1,026,121 for additions to the Phase II engineering services contract for improvements along Deerfield Road, from Illinois Route 21 to Saunders Road.

 

Staff Summary

                     Change Order Number Two includes additional engineering evaluation and redesign due to unforeseen changes along the corridor. These include redesign of the drainage system to provide for new increased rainfall data (Bulletin 75), modifications to the Des Plaines River bridge to accommodate the Lake County Public Works sanitary sewer force main, ongoing development of the Federal Life and new Thorton’s Gas Station properties, and Illinois Department of Transportation design and documentation requests.

                     This will result in a net savings to the project by minimizing improvements to the Des Plaines River bridge and lowering land acquisition costs.

                     The County Board, at its May 12, 2020, meeting, approved an appropriation of $3,165,000 of Motor Fuel Tax funds and a professional engineering services agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, at a maximum cost of $2,634,307.26, for improvements along Deerfield Road.

                     The sum of all contract change orders to date is $1,046,778, which represents a 40 percent increase over the original awarded contract.

                     This project is included in the Transportation Improvement Program and designated as Section 15-00038-07-WR.

 

Body

RESOLUTION

 

WHEREAS, Deerfield Road, County Highway 11, and Saunders Road, County Highway 58, are designated routes on the County highway system; and

 

WHEREAS, Lake County believes it would be beneficial for the safety and welfare of the traveling public to improve Deerfield Road, from Illinois Route 21 to Saunders Road; and

 

WHEREAS, the County Board, at its meeting on May 12, 2020, approved an appropriation of $3,165,000 of Motor Fuel Tax funds and an engineering services agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, in the amount of $2,634,307.26 for these improvements; and

 

WHEREAS, Change Order Number Two, in the amount of $1,026,121, is needed for additional Phase II professional engineering services to the original contract; and

 

WHEREAS, a supplemental appropriation of funds is necessary for the additional scope of work.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that the County Engineer of Lake County is authorized and directed to execute on behalf of Lake County, Change Order Number Two in the amount of $1,026,121 for additional professional engineering services for improvements along Deerfield Road, from Illinois Route 21 to Saunders Road; and

 

BE IT FURTHER RESOLVED, that there is hereby appropriated a supplemental amount of $570,000 of Motor Fuel Tax funds for these additional professional engineering services, and designated as Section 15-00038-07-WR; and

 

BE IT FURTHER RESOLVED, that the County Clerk is hereby directed to transmit four certified originals of this resolution to the District One Office of the Illinois Department of Transportation; and

 

BE IT FURTHER RESOLVED, that this appropriation be processed by the County Engineer for final approval on behalf of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated May 3, 2018.

 

DATED at Waukegan, Illinois, on November 12, 2024.