Lake County, IL
File #: 20-0695    Version: 1 Name: Concrete Patch 2020: Appropriation and Contract Award
Type: resolution Status: Passed
File created: 5/20/2020 In control: Public Works, Planning & Transportation Committee
On agenda: Final action: 6/9/2020
Title: Joint resolution authorizing a contract with A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, in the amount of $192,145.50 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $230,600 of Motor Fuel Tax funds.
Attachments: 1. 20-0695 Bid Tab - 2020 Concrete Patching, 2. 20-0695 Vendor Disclosure, A Lamp Concrete Contractors, 3. 20-0695 Location Map, Concrete Patching (Delany), 4. 20-0695 Location Map, Concrete Patching (Midlothian), 5. 20-0695 Location Map, Concrete Patching (Washington and Peterson)

Title

Joint resolution authorizing a contract with A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, in the amount of $192,145.50 for concrete patching on various County highways, which will be improved under the Illinois Highway Code and appropriating $230,600 of Motor Fuel Tax funds.

 

Staff Summary

                     Each year the County undertakes patching of its concrete pavements to preserve pavement life and surface quality, including repairing damaged manholes, catch basins, curbs, and gutters.

                     This patching and repairing is done on isolated sections of pavements and is included in the highway improvement program, but not listed individually.

                     There was a public call for bids, and a total of six bids were received, ranging from $192,145.50 to $599,500, and the lowest responsible bidder is A Lamp Concrete Contractors, Inc., in the amount of $192,145.50.

                     This improvement is designated as Section 20-00000-10-GM.

 

Body

R E S O L U T I O N

 

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for concrete patching on various county highways.

 

WHEREAS, pursuant to said publication and calling for said bids, sealed bids were received and opened on May 12, 2020, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

A Lamp Concrete Contractors, Inc.

Schaumburg, Illinois

$192,145.50

 

Schroeder and Schroeder, Inc.

Skokie, Illinois

$235,681.50

 

Landmark Contractors, Inc.

Huntley, Illinois

$267,614.10

 

Alliance Contractors, Inc.

Woodstock, Illinois

$276,364.74

 

Copenhaver Construction

Gilberts, Illinois

$338,812

 

Path Construction Company

Arlington Heights, Illinois

$599,500

 

WHEREAS, the Public Works, Planning and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, their bid being $192,145.50 based on estimated quantities and unit prices; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE BE IT RESOLVED by this Lake County Board, that a contract be awarded to said A Lamp Concrete Contractors, Inc., Schaumburg, Illinois, in accordance with their bid of $192,145.50, based on estimated quantities and unit prices, and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for concrete patching on various County highways which will be improved under the Illinois Highway Code, and designated as Section 20-00000-10-GM.

 

BE IT FURTHER RESOLVED that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further Board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation.

 

BE IT FURTHER RESOLVED that the Clerk is hereby directed to transmit four certified originals of this resolution to the district office of the Illinois Department of Transportation.

 

BE IT FURTHER RESOLVED that there is hereby appropriated $230,600 of Motor Fuel Tax funds for this improvement.

 

BE IT FURTHER RESOLVED that this award be processed by the County Engineer for final approval of the Illinois Department of Transportation in accordance with the “Agreement of Understanding” between the Illinois Department of Transportation and Lake County, dated May 3, 2018.

 

DATED at Waukegan, Illinois, on June 9, 2020.