File #: 25-0423    Version: 1 Name: Culvert Lining 2025 (Miller and Deerfield) Contract Award and Appropriation
Type: resolution Status: Passed
File created: 3/12/2025 In control: Public Works and Transportation Committee
On agenda: Final action: 4/8/2025
Title: Joint resolution authorizing a contract with Hoerr Construction, Inc., Goodfield, Illinois, in the amount of $71,225 to install cured-in-place pipe liners in culverts located on Miller Road and Deerfield Road, and appropriating $85,000 of County Bridge Tax funds.
Attachments: 1. 25-0423 Bid Tabulation - Culvert Lining 2025, 2. 25-0423 Vendor Disclosure, Hoerr, Culvert, 3. 25-0423 Location Map, Culvert Lining 2025

Title

Joint resolution authorizing a contract with Hoerr Construction, Inc., Goodfield, Illinois, in the amount of $71,225 to install cured-in-place pipe liners in culverts located on Miller Road and Deerfield Road, and appropriating $85,000 of County Bridge Tax funds.

 

Staff Summary

                     Culverts #568 on Miller Road and #1344 on Deerfield Road are at the end of their service life and require rehabilitation with cured-in-place pipe liners.

                     There was a public call for bids, and a total of four bids were received, ranging from $71,225 to $188,931, and the lowest responsible bidder is Hoerr Construction, Inc., Goodfield, Illinois, in the amount of $71,225.

                     This project is included in the Transportation Improvement Program with construction to be completed in 2025 and designated as Section 24-00999-11-DR.

 

Body

RESOLUTION

 

WHEREAS, pursuant to authority granted by this County Board of Lake County, Illinois, the County Engineer heretofore called for sealed bids, by publication, for the installation of cured-in-place pipe liners in culverts on Miller Road and Deerfield Road, and designated as Section 24-00999-11-DR; and

 

WHEREAS, pursuant to said publication calling for said bid, sealed bids were received and opened on March 11, 2025, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Hoerr Construction, Inc.

Goodfield, Illinois

$71,225

 

Insituform Technologies USA, LLC

Chesterfield, Missouri

$99,059

 

National Power Rodding Corp.

Chicago, Illinois

$107,806

 

Alliance Contractors, Inc.

Woodstock, Illinois

$188,931

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Hoerr Construction, Inc., Goodfield, Illinois, their bid being $71,225, based on estimated quantities and unit prices; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this County Board of Lake County, Illinois, that a contract be awarded to said Hoerr Construction, Inc., Goodfield, Illinois, in accordance with their bid of $71,225, based on estimated quantities and unit prices, and that the Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized and they are hereby directed to enter into a contract with said low bidder for the installation of cured-in-place pipe liners in culverts on Miller Road and Deerfield Road, and designated as Section 24-00999-11-DR; and

 

BE IT FURTHER RESOLVED, that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation; and

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $85,000 of County Bridge Tax funds.

 

DATED at Waukegan, Illinois, on April 8, 2025.