File #: 08-0628    Version: 1 Name: Delany Road (Sunset Avenue to Wadsworth Road) Add Lanes; Phase II Engineering: Supplemental Appropriation.
Type: resolution Status: Passed
File created: 8/28/2008 In control: Public Works and Transportation Committee
On agenda: Final action: 9/9/2008
Title: Joint resolution providing a supplemental appropriation of $170,000.00 of Matching Tax funds for Phase II engineering services (Design Engineering) for the proposed widening, and resurfacing of Delany Road (County Highway 22) from Sunset Avenue (County Highway 46) to Wadsworth Road (County Highway 17).

Title

Joint resolution providing a supplemental appropriation of $170,000.00 of Matching Tax funds for Phase II engineering services (Design Engineering) for the proposed widening, and resurfacing of Delany Road (County Highway 22) from Sunset Avenue (County Highway 46) to Wadsworth Road (County Highway 17).

Staff Summary

                     Delany Road (Sunset Avenue to Wadsworth Road) Add Lanes; Phase II Engineering: Supplemental Appropriation.

                     Phase II engineering (Design Engineering) is partially completed for this improvement.

                     Additional engineering services to accomplish the proposed widening and resurfacing of Delany Road (County Highway 22) from Sunset Avenue (County Highway 46) to Wadsworth Road are required.

                     Change Order # 4 in the amount of $174.564.83 has been approved for this work.

                     A supplemental appropriation for design engineering is needed.

                     The supplemental appropriation is $170,000.00 of Matching Tax funds.

 

Body

R E S O L U T I O N

 

WHEREAS, this County Board of Lake County, Illinois, by prior resolution at its meeting of January 11, 2005, entered into and agreement with Christopher B. Burke Engineering, Ltd., Rosemont, Illinois, for the provision of Phase II engineering services (Design Engineering) for the proposed widening and resurfacing of Delany Road (County Highway 22) from Sunset Avenue (County Highway 46) to Wadsworth Road (County Highway 17) and designated as Section 00-00093-15-WR; and 

 

WHEREAS, this County Board of Lake County, Illinois, by prior resolutions appropriated $730,000.00 of Matching Tax funds for the above-said engineering services; and

 

WHEREAS, it is deemed necessary to expand the scope of services to provide for the proposed widening, and resurfacing of Delany Road (County Highway 22) from Sunset Avenue (County Highway 46) to Wadsworth Road to include FEMA Flood Plain mapping, the design of soils remediation, the preparation of traffic signal plans at Delaney Road intersection with Continental Drive, and revisions and additions to the Plat of Highways prepared for the acquisition of necessary right-of-way; and

 

WHEREAS, the cost of these additional Phase II engineering services (Design Engineering) is estimated to be $153,373.49; and

 

NOW, THEREFORE BE IT RESOLVED BY this County Board of Lake County, Illinois, that a supplemental appropriation of $170,000.00 of Matching Tax funds is hereby appropriated for the provision of Phase II engineering services (Design Engineering) as part of Section 00-00093-15-WR.

 

 

 

 

 

 

Dated at Waukegan, Illinois

this 9th day of September 2008