Title: Joint resolution authorizing a contract with Rausch Infrastructure, LLC, Des Plaines, Illinois, in the amount of $1,695,915.56 for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, appropriating $2,035,000 of County Option Motor Fuel Tax funds.
Attachments: 1. 23-0302 Bid Tab, Stearns School Road, 2. 23-0302 Justification of Bid, Stearns School Road, 3. 23-0302 Vendor Disclosure, Rausch Infrastructure, 4. 23-0302 Location Map, Stearns School Rd

Title

Joint resolution authorizing a contract with Rausch Infrastructure, LLC, Des Plaines, Illinois, in the amount of $1,695,915.56 for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, appropriating $2,035,000 of County Option Motor Fuel Tax funds.

 

Staff Summary

                     There was a public call for bids, and a total of five bids were received, ranging from $1,695,915.56 to $2,270,410.53, and the lowest responsible bidder is Rausch Infrastructure, LLC, Des Plaines, Illinois, in the amount of $1,695,915.56.

                     This improvement is included in the Transportation Improvement Program with construction in 2023, and designated as Section 20-00235-02-BR.

 

Body

RESOLUTION

 

WHEREAS, pursuant to authority granted by this Lake County Board, the County Engineer heretofore called for sealed bids, by publication, for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, and designated as Section 20-00235-02-BR; and 

 

WHEREAS, pursuant to said publication calling for said bid, sealed bids were received and opened on February 7, 2023, at 10:00 a.m. at the Lake County Division of Transportation in Libertyville, Illinois; a tabulation of said bids being as follows:

 

Rausch Infrastructure, LLC

Des Plaines, Illinois

$1,695,915.56

 

Lorig Construction Company

Des Plaines, Illinois

$1,706,065.16

 

Alliance Contractors, Inc.

Woodstock, Illinois

$1,874,109.34

 

F.H. Paschen, S.N. Nielsen & Associates LLC

Chicago, Illinois

$1,981,197.26

 

Areatha Construction Co., Inc.

Streamwood, Illinois

$2,270,410.53

 

WHEREAS, the Public Works and Transportation Committee, the County Engineer and the Purchasing Agent have examined each bid, and it appears that the lowest responsible bidder is Rausch Infrastructure, LLC, Des Plaines, Illinois, their bid being $1,695,915.56 based on estimated quantities and unit prices; and

 

WHEREAS, an appropriation of funds is required.

 

NOW, THEREFORE, BE IT RESOLVED, by this Lake County Board, that a contract be awarded to said Rausch Infrastructure, LLC, Des Plaines, Illinois, in accordance with their bid of $1,695,915.56 based on estimated quantities and unit prices, and that the County Purchasing Agent, the County Clerk, and the County Engineer of Lake County be authorized, and they are hereby directed to enter into a contract with said low bidder for the replacement of the Stearns School Road at Mill Creek triple barrel culverts with a single span bridge structure, and designated as Section 20-00235-02-BR.

 

BE IT FURTHER RESOLVED, that in as much as such estimated quantities are the best approximation that can be determined at this time, these quantities may be added to, deducted from, or modified from in the final determination of the contract cost in accordance with Chapter 605 of the Illinois Compiled Statutes, Act 5, Section 5-205.2 without further Board action, providing the final cost chargeable to the funds appropriated does not exceed the appropriation.

 

BE IT FURTHER RESOLVED, that there is hereby appropriated $2,035,000 of County Option Motor Fuel Tax funds.

 